Good morning all,
Quiet night no major problems on molding floor. I put the new control in matsui drier, its still in shop I let it run for around an hr or so with no problems so I green tagged it.
Have a great day
Mike
Good morning all,
Quiet night no major problems on molding floor. I put the new control in matsui drier, its still in shop I let it run for around an hr or so with no problems so I green tagged it.
Have a great day
Mike
MP-16 Dryer D-9 Temp. probe alarm. They were running it at 250 & the High limit was at 200. Reset- OK.
Loader #6 on mezzanine not loading. The loader flap was stuck & not making the switch.
MP- Lube cycle alarm. Reset the counter & installed a new tube of grease.
MP-The boss fitting on the top inj. pump line was leaking. I took the line & fitting off ; the o-ring was cut. Mark had to go to IR-G to get
the right o-ring. He reinstalled it – looks good.
MP-9 The C- axis on the robot wasn’t working. I found a cracked air fitting at the solenoid. Also the coil piston was gummed up.Cleaned &
reinstalled – Working good.
Good morning,
Fairly peaceful night, minor adjustment on nippers on the fixture on press 3.
Tried to calibrate gravity loader on the dryer that is behind press 8 it still not acting right
Removed another small nozzle leak from press 15 no damage only down couple minutes.
Have good day
Mike
Hello All,
They finally released some funds to order parts to repair one of the two grinders we still have tore down. I chose the bigger one and ordered the parts for it today. I’ll order the parts to repair the little Solo grinder next month.
Also, I’m got approval to do a CER tomorrow for two New Grinders specified for Pelethane (Santoprene). I chose to go with AEC because they have recently purchased
Attached are the specs and quote so that everyone can check it out.
Thanks
Joshua Ledbetter
Molding Maintenance Manager
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
Good morning,
I helped
Have a great day.
MP-20 Nozzle adapter heater band was bad---- replaced.
MP-25 The cores were backwards. Normally the core cylinder is fixed & the shaft moves ; on the hokey handle mold the cylinder moves , so the
set & pull lines hook up backwards.
MP-25 Replaced the motor overload on the grinder.
MP-2 The rear zone heater - mercury contactor blew up. Mark & I contacted Walter Marcum. We cleaned out the cabinet & disposed of the mercury
In the drum in the recycle room. Installed a new contactor.
Upgraded robot displays with speed control adjust on MP3, 8, 9, 10, and 11 today.
Ran chiller water to the dryer behind MP8 off the machine manifold and hung a sign on the ball valves, not to shut off unless machine pump and dryer are shutdown first.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
MP-20 The cycle start timer wasn’t working. We saw input 14 on the plc flickering. Mark traced the wire & found a loose connection in the robot wiring.
MP-5 Added hydraulic fluid.
MP-2 & 6 PMed.
MP-20 Mold # 77015 – The DME heater plug on the mold had a broke pin – zone 6. I replaced the plug. The wires were short in the box so I had to add another splice in the wiring. I’ll have tooling let me
know when the mold comes back & I’ll fix it right.
MP-5 Pump motor overload tripped. Injection valve – off fault. Mark said the pack time was set too high. He lowered the time & it hasn’t stopped again.
MP-3 Zone 3 barrel temp was running away. The mercury contact was stuck- replaced it.
I worked on the bag clip hot stamp. The heat kept dropping out. I found a loose solder connection on the board. I re- soldered it & I have been trying it out
In the shop. So far I hasn’t cut off.
R. Upchurch
I vacuumed out the rest of the oil pans & emptied the waste oil drum.
I installed the QVC fascia pad & set up the hot stamp. The pad isn’t contoured to the part, so it took a lot of shim tape. They changed the location of the artwork
AGAIN !!!!! I located the new pad so they can change back to the old one without moving the mounting plate.
R. Upchurch
MP-23 & 25 Replaced broken lube fittings – ( tie bar & skate )
MP-14 Replaced broken ¾” water supply line on thermolater.
MP-8 Blender regrind valve not opening; may be static causing the controller to lose set points. Will try a ground wire on it.
Cleaned out oil pans on MP-6 & 7.
MP-25 Lost ejector back position; Mark & Jason adjusted the encoder.
R. Upchurch
8/23/10
Added Flow Controls to MP10 ‘s Dukane Welder Door Ext. Need to move prox down to clamp close on fixture and eliminate door plumbing to reduce shock and vibration dislodging deflector on part.
Worked with Elaine on out of stock flow controls.
Upgraded Robot Displays with on the fly speed control adjustment screens on MP6 and MP2. Only machines not running.
Picked up hose adapters for Dryer / Hoppers 1 ½ to 2” to eliminate small hoses.
Picked up keys for Mike and Josh
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Me and Gary set up Dukane welder with new fixture and new Branson Horn. Located, drilled and tapped for new fixture. Shimmed fixture .080” to get closer to parallel horn to part. Dropped down stop to just above main part body. Started with .8 weld time and could not tear weld with pliers. Weld was very Hot, some weld slag visible on part. Reduced weld time to .6 sec, still welding all around. Parts look better. Run 30-40 parts, looks good. Turned over to production. Have a Nice Day!
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
August 19, 2010
Upgraded MP 25 with new core sequence program. Changed P-ROM chips. Tried out works fine. Cores “off” , Special Core Seqence “on”.
Flipped Slide cyl on gate cutter tooling over for clearance.
Worked on Matsui Dryer Hopper DR53. No display. Check fuses, power, relays, run/stop switch, think it needs new board. Will call Matsui tomorrow.
Worked on Cinci Dryer in shop. Getting overtemp alarm on bed shift. They were trying to run it at 130 degrees for Acrylic. Raised the temp to 160 and overtemp to 35, had no problems.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Trying to get Mike set up
Joshua Ledbetter
Molding Maintenance Manager
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
Branson Welder Setup with new horn and fixture is Weld Time .700 Hold Time .200 Trigger Press 4 Main Air 35psi. Also tuned welder with current horn setup.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
August 18, 2010
Replace thermolator on MP1. Brought the faulty one to shop, not heating.
Set up old Branson 910IW Sonic Welder with new fixture and new horn. Had to go with the BLACK booster, as silver did not have enough power to weld properly. It is over by the other not used equip, back of molding.
Helped Josh adjust MP21 Screw pressure to correspond with percentage on panel.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
8/17/10
Ordered switch for power feed on milling machine.
Ordered additional 3.6 volt memory back up batteries for mold machines.
Replaced mitsu contactor in mold machine in warehouse.
IRG trained Mike on hose crimper. Made new hose for mold #76010. Replaced hose.
Worked on MP10 sonic welder, had slight misalignment.
Showed Mike oil storage area to take spent filters to drain.
Replaced memory back up battery in MP4.
Looked at old hot stamp on MP20, need to schedule it down sometime to tear down and tighten connections from display to main board.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
MP-2 The bottom core on the top cover mold is leaking. Bill Potter said they had to run it until tomorrow morning. I put some pads down.
I worked with Mark on the base plate eoat. It should be ready to start setting up; When ever they give us the press.
I set up the fixtures on the band saw in our shop & the saw in the molding shop to rework the cardboard.
I cut & threaded some ½” pipe for molding techs.
R. Upchurch
I worked on the Classic fascia hot stamp. I got it set up with the small print pad. Randy is supposed to get us the QVC pad with the large print so we
can locate & drill the mounting holes .
I also worked on the Eagle fascia hot stamp. I got the mounting plate cut to fit & transferred holes in the slots to the base. All that’s left is mounting
the pad to the hot plate & set up.
MP-2 The top core on the top cover mold was bleeding off. I put a gauge on the valve & saw it was dropping out. They had it on core 2, so I changed
It over to core 1 & it worked fine. Will need to check it out when they finish the run.
I touched base with security & receiving all day --- Still no sign of the barrel. WT #*@*!!!!!!!!!!
R. Upchurch
MP- Robot kept stopping on “ Y “ axis. We found the over stroke block had moved.
MP-5 Robot CPU fault. Mark pulled & replaced the cpu card & cleared the fault.
MP-20 Replaced the nozzle heater band & thermocouple.
MP-16 Ejector cylinder bolts broke; Found 1/8” difference in the knock-out length. Had tooling turn down knock-outs, replaced eject. bolts,
& made a new eject. switch bracket.
Ordered more brass compression fittings from Nissei. ( for tie bar lube )
MP-5 Core 2 Leaking at manifold. Removed the fittings and put new Teflon on.
MP-6 thru 12 Vacuumed out oil pans.
MP-3 hooked up core switches & hydraulics on funnel mold.
MP-26 The chiller return line ball valve is cracked - the valve that comes out of the 4” line up top.
MP-3 The barrel end cap is leaking. I kept an eye on it so they could finish the run. At the end of C shift, they needed about 100 more parts.
They’re doing a mold change tonight. The end cap needs to come off to clean & reseat; That is if it’s not cracked.
R, Upchurch
MP-18 Installed chain on dummy plug.
MP-22 The parts were getting black swirls. We pulled the nozzle & adapter and got Fred to turn down the threads for a better seat.
MP-21 Put new heat shrink tubing on the large fan grippers.
We started fabricating the water tank for the Hokey handles .
MP-6-7-8 & 9 Vacuumed out oil pans.
R. Upchurch
MP-11 Cores not working. There was a bad spot in the cable. Replaced the cable & six pin plug. Rewired the bad one.
Mixer # 1 Replaced the air cylinder on the dump valve; next to the one that was replaced last week. It was getting weak.
I made the Eagle fascia hot stamp pads a stock item. It wasn’t done when Randy ordered them & there was only one spare. When the
new pads come in for the hokey, I’ll get those put in stock too. Randy only ordered two.
R. Upchurch
MP-17 PVC rusted the hopper; It wasn’t sprayed with acid neutralizer. I took it off & bead blasted it.
MP-21 Worked with Mark on the robot vacuum switch.
We rounded up some more of the large metric wrenches & hung them up with the rest of the wrenches.
The aluminum came in. We put the sheets in the rack & the plates for the fixtures are on our work table.
I moved the hot stamp to our shop & will get started on it when Randy gets the nest to me.
R. Upchurch
Robot on MP21, vacuum would not work. Voltage was toggling on board but not out on the connector (V3V) for vacuum solenoid, solid red wire was broken in tray somewhere. Spliced into another connector. OK.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
MP4, Zone 1 was running away, contactor stuck, replaced with new one.
MP15, Replace small shock absorber on crosswise for sprue picker. More are on order.
We received a spare pressure transducer for the Cincinati’s. It is on shelves to the left in MRO.
Helped
Ordered program change to include additional core sequence for MP25 from NIssei to EJECT before CORE pull.
Worked on MP21 inject side. Back Screw position was stopping short of desired location. Made adjustments to internal codes 32 and 33 to remedy.
I sent out procedure on previous log.
Talked with R Russell about Hoky wheel and hub press. Ordered 2 hand tie down and pilot operated valve for new station. Also ordered alum tabletop.
Working on setting up Vendor for Robot EOAT quick change plates. I tested the orings on the dovetail slide and they held at 80psi.
Filled out PR for Rapid Grinder components destroyed by grinding hot runners. It was rejected at this time due to lack of funds.
Ordered, received, installed new hooks and shackles for robot chain slings. They are located in the bottom of the gray cabinet in the shop labled Large Hand Tools.
Ordered fittings and bolt kit for core valve install on MP23.
Ordered and received Asco valves for Thermolators. They are located in MRO on the RH shelves above the alum load system fittings.
Started replacing the adjustable stop screws with winged handles on MP23 Robot. Some bolt hole patterns were to close for 2 handles. I will check with HIro for some different stops. More handles with longer bolts and metal handle are on order.
Any questions just give me a call,
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
MP21 (TOSHIBA ISE250N) Screw Back Position Correction
1) With the power on, open the Main Control Cabinet Doors,
2) On the inside of the LH door, locate a blue tuning pot, with the numbers 0-9,
it is extreme upper LH side of injection control board under a terminal strip, dial the
pot to the #1 position.
3) Under the blue tuning pot, locate and depress, a push button labeled “3SW”.
4) Now, over on the Data Cell Display, punch in code 32 and change the value to 1.0 or .5
Record the original value.
5) Now punch in code 33 and change the value to 40. Record the original value.
Make sure the value you enter are retained.
6) Turn the tuning pot back to the “0” position.
7) Depress the “3SW” push button. You are finished.
Original Values on July 14, 2010 were Code 32 = 4.0 and Code 33 = 16.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
Sorry, I didn’t send attachment. Here it is..
Joshua Ledbetter
Molding Maintenance Manager
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
Attached is a calendar for shutdown this year. Also, for anyone who does not already know, we are tracking issues, projects, and parts ordering here- O:\Molding\MOLDINGSUPPORT\Oreck\Departments\Maintenance\Tracker.xls
Joshua Ledbetter
Molding Maintenance Manager
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235