Friday, August 20, 2010
8.19.10 D shift
Mp#17- Cleaned up oil and replaced absorbent.
Replaced the pressure gage on the fan housing destructive tester. Evidently someone needed it.
Cleaned up in maintenance shop and hauled out the trash and cardboard.
Submitted a PTO day for September 7th, 2010.
Call if there are any questions.
Thursday, August 19, 2010
August 19, 2010
August 19, 2010
Upgraded MP 25 with new core sequence program. Changed P-ROM chips. Tried out works fine. Cores “off” , Special Core Seqence “on”.
Flipped Slide cyl on gate cutter tooling over for clearance.
Worked on Matsui Dryer Hopper DR53. No display. Check fuses, power, relays, run/stop switch, think it needs new board. Will call Matsui tomorrow.
Worked on Cinci Dryer in shop. Getting overtemp alarm on bed shift. They were trying to run it at 130 degrees for Acrylic. Raised the temp to 160 and overtemp to 35, had no problems.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Test
Trying to get Mike set up
Joshua Ledbetter
Molding Maintenance Manager
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
8.18.10 D shift
Replaced bad contactor on the thermolator that was in the shop. Green tagged it and placed back in the auxilliary equipment area.
Made a fixture for the intake pivot to be drilled out at the mounting tab. The hole was flashed in and several had to be reworked, at Marty's request.
Repaired the web-trak sensor cable on the compact cannister hotstamp press. The cable had rubbed into the heater plate melting through it.
Soldered and tied it back up neatly.
The dryer in the shop needs the process blower changed out. I didn't see one in MRO so I plan to take the one from the dryer on the trailer out back to repair it. Also changed out the bad contactor in it.
Call if there are any questions.
Sean
Wednesday, August 18, 2010
Branson Welder Setup
Branson Welder Setup with new horn and fixture is Weld Time .700 Hold Time .200 Trigger Press 4 Main Air 35psi. Also tuned welder with current horn setup.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
August 18, 2010
August 18, 2010
Replace thermolator on MP1. Brought the faulty one to shop, not heating.
Set up old Branson 910IW Sonic Welder with new fixture and new horn. Had to go with the BLACK booster, as silver did not have enough power to weld properly. It is over by the other not used equip, back of molding.
Helped Josh adjust MP21 Screw pressure to correspond with percentage on panel.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Tuesday, August 17, 2010
August 17, 2010
8/17/10
Ordered switch for power feed on milling machine.
Ordered additional 3.6 volt memory back up batteries for mold machines.
Replaced mitsu contactor in mold machine in warehouse.
IRG trained Mike on hose crimper. Made new hose for mold #76010. Replaced hose.
Worked on MP10 sonic welder, had slight misalignment.
Showed Mike oil storage area to take spent filters to drain.
Replaced memory back up battery in MP4.
Looked at old hot stamp on MP20, need to schedule it down sometime to tear down and tighten connections from display to main board.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Monday, August 16, 2010
8.15.10 D shift
Worked on robot PM's this weekend. I was able to do them all except for the ones on MP#6 and #7 machines.
Call if there are any questions or I can help with anything.
Talked with Wayne McConnel yesterday, his number is 931-646-7853 for anyone who does not have his number.
Sean
Saturday, August 14, 2010
8.13.10 D shift
Robot on 2,3,and 5 Pm'd.
Replaced the hopper sensor cable on #6 machine.
Replaced a nozzle heaterband on #2 machine.
Will resume tonight again.
Sean
Friday, August 13, 2010
" C " Shift
MP-2 The bottom core on the top cover mold is leaking. Bill Potter said they had to run it until tomorrow morning. I put some pads down.
I worked with Mark on the base plate eoat. It should be ready to start setting up; When ever they give us the press.
I set up the fixtures on the band saw in our shop & the saw in the molding shop to rework the cardboard.
I cut & threaded some ½” pipe for molding techs.
R. Upchurch
Wednesday, August 11, 2010
8.10.10 D shift
Put the old screw and barrel from it back in the crate and located it on the storage trailor.
I labelled the #3 novatec hopper/dryer "waiting on repair parts" and put it in the auxilliary equipment area until we decide what we are going to do with it, so it would not be sitting around in the shop. I think we just need some new loader controllers and top hat assemblies to put them back online? We can buy something or rig something up? Let me know what you want to do.
If we can get the go-ahead, I can round up a lot of this stuff we are never going to use and gut the parts out of it and throw the rest in the scrap metal hopper. "5-S" style. See what you think.
Worked on Robot PM's. #20,#21, #22, #23,#24, and #25. I will submit the work order's Friday.
Call if you have any questions or want to make me laugh!
Sean
Friday, August 6, 2010
8.5.10 D shift
Where I am now is, I put the 110vac transformer on the other relay box (the one from 18) and got it working again. Because that model of relay box indicates using the newer style pendants, and because that box supports features that the newer pendant has, I got the other controller cable to use with it when it comes back from being repaired. I do think we should attempt using the old style pendants unless we have a valid interface diagram for them. I contacted Yushin via E-mail for more specific information and am awaiting a response.
The Barrel for MP#1 did not come in last night.
There has been a molding meeting scheduled for Tuesday 5 and 6 pm.
Call if there are any questions.
Sean
Thursday, August 5, 2010
" C " SHIFT
I worked on the Classic fascia hot stamp. I got it set up with the small print pad. Randy is supposed to get us the QVC pad with the large print so we
can locate & drill the mounting holes .
I also worked on the Eagle fascia hot stamp. I got the mounting plate cut to fit & transferred holes in the slots to the base. All that’s left is mounting
the pad to the hot plate & set up.
MP-2 The top core on the top cover mold was bleeding off. I put a gauge on the valve & saw it was dropping out. They had it on core 2, so I changed
It over to core 1 & it worked fine. Will need to check it out when they finish the run.
I touched base with security & receiving all day --- Still no sign of the barrel. WT #*@*!!!!!!!!!!
R. Upchurch
8.04.10 D shift
I took the interface into the shop along with the picker from 14 so I could work on it while they ran press 18.
I hooked up a 200vac supply circuit to it again and it was blowing those fuses as well, but not the ones on the intrface board, so I am looking at a bad transformer possibly on that interface.
Then I looked at the other interface and found a bad fuse on the board. I replaced it and followed through the relays on the diagram. I tested the picker out on it and it worked fine. I jumped out the option we will likely not use (injection verified) so it would not need a relay there. I labelled all the wires after tracing them back on the terminal strip and will put the SPI plug on it tomorrow and double check the wire connections in press #18 if it is down.
I will let you know how it goes.
MP#1-Ronnie is going to call me today when(if) the barrel comes in today and I will help him install it and get it going. provided we have all the parts.
Call if there are any questions.
Sean
Sunday, August 1, 2010
" C " Shift Weekend
MP- Robot kept stopping on “ Y “ axis. We found the over stroke block had moved.
MP-5 Robot CPU fault. Mark pulled & replaced the cpu card & cleared the fault.
MP-20 Replaced the nozzle heater band & thermocouple.
MP-16 Ejector cylinder bolts broke; Found 1/8” difference in the knock-out length. Had tooling turn down knock-outs, replaced eject. bolts,
& made a new eject. switch bracket.
Ordered more brass compression fittings from Nissei. ( for tie bar lube )
MP-5 Core 2 Leaking at manifold. Removed the fittings and put new Teflon on.
MP-6 thru 12 Vacuumed out oil pans.
MP-3 hooked up core switches & hydraulics on funnel mold.
MP-26 The chiller return line ball valve is cracked - the valve that comes out of the 4” line up top.
MP-3 The barrel end cap is leaking. I kept an eye on it so they could finish the run. At the end of C shift, they needed about 100 more parts.
They’re doing a mold change tonight. The end cap needs to come off to clean & reseat; That is if it’s not cracked.
R, Upchurch
Wednesday, July 28, 2010
7.27.10 D shift
Welded the tank for the handle project. It needs to marked for the chiller fitting locations and I will weld the nipples in place and anything else that needs done.
Mp#18- Installed the 120vac Robot receptacle. Fused for 5 amps and checked that E-stop killed power. Labelled everything.
Mp#2- Got an error E00240. We powered it down and when it came back up it automatically went into reloading from the boot card.
When it came back up it evidently did not have the core 2 programming saved on the boot card because it does not have the page on the menu.
It is operational right now as the mold in it is only using core 1, but likely we need to reinstall that.
Call if there are any questions, be back Friday.
Sean
Tuesday, July 27, 2010
" C " Shift
MP-18 Installed chain on dummy plug.
MP-22 The parts were getting black swirls. We pulled the nozzle & adapter and got Fred to turn down the threads for a better seat.
MP-21 Put new heat shrink tubing on the large fan grippers.
We started fabricating the water tank for the Hokey handles .
MP-6-7-8 & 9 Vacuumed out oil pans.
R. Upchurch
Thursday, July 22, 2010
7.21.10-
Wednesday, July 21, 2010
" C " Shift
MP-11 Cores not working. There was a bad spot in the cable. Replaced the cable & six pin plug. Rewired the bad one.
Mixer # 1 Replaced the air cylinder on the dump valve; next to the one that was replaced last week. It was getting weak.
I made the Eagle fascia hot stamp pads a stock item. It wasn’t done when Randy ordered them & there was only one spare. When the
new pads come in for the hokey, I’ll get those put in stock too. Randy only ordered two.
R. Upchurch
Monday, July 19, 2010
7/17/10 weekend D shift
Likely it will cause it to eventually wear out and then there will be none to replace it with.
It is in the shop.
Robot on #9- Rack and gear stripped out on the X- axis. I replaced them both and cleaned and greased the bearings. O.K. to run.
Mp#19- at 7pm on Sunday, we found the grinder completely full of santoprene from the handle overmold. It had not melted down yet but was on its way. The operator on our shift had put no runners in it yet because he was told that it was not working from the previous operator.
Mp#13- had a water leak and water got into the ejector valve cover causing it to short and malfunction. They had reported to Ronnie that it was running and the ejectors just quit working. We cleaned it out and they started working again. It stopped a few more times and I blew everything out with an air hose under there and set-up a fan for the rest of the night.
Robot on #4-Put new Keenserts in the Robot wrist to accept end of arm tooling. Holes were stripped out.
Mp#20- Butterfly bolts broke on ejector platen and eject forward switch was damaged. Replaced screws and switch, checked operation. O.k. to run.
Call if there are any questions.
Sean
