Wednesday, August 25, 2010

8.24.10 D shift

75033 Mold- Seems like each time they change the tool, a new core switch and/or cable have to be replaced on the mold. I am starting to collect a few broken ones now.

I went through presses 6 through 11 and installed a gard so they do not push the trolleys into the robot power plugs.

Installed runner chute from aluminum onto the grinder on #11 because Marty said that Wayne does not like cardboard and tape.

Put the one-shot loader on the Nova-tech hopper/dryer #3 and put it back into operation. Looking at wiring up something to make use of the other top-hat on the table in the shop.(maybe put it on the hopper that is on the trailer?

Worked on PM's tonight, will continue through the weekend.

Call if there are any questions.

Sean

Tuesday, August 24, 2010

" C " Shift

I  vacuumed out the rest of the oil pans & emptied the waste oil  drum.

 

I installed the QVC fascia pad & set up the hot stamp. The pad isn’t contoured to the part, so it took a lot of shim tape. They changed the location of the artwork

   AGAIN !!!!!    I located the new pad so they can change back to the old one without moving the mounting plate.

 

 

 

 

 

 

 

R. Upchurch

Monday, August 23, 2010

" C " Shift

MP-23 & 25  Replaced broken lube fittings – ( tie bar & skate )

 

MP-14   Replaced broken ¾” water supply line on thermolater.

 

MP-8  Blender regrind valve not opening; may be static causing the controller to lose set points. Will try a ground wire on it.

 

Cleaned out oil pans on MP-6 & 7.

 

MP-25  Lost ejector back position;  Mark & Jason adjusted the encoder.

 

 

R. Upchurch

August 23, 2010

8/23/10

 

Added Flow Controls to MP10 ‘s Dukane Welder Door Ext.  Need to move prox down to clamp close on fixture and eliminate door plumbing to reduce shock and vibration dislodging deflector on part. 

 

Worked with Elaine on out of stock flow controls.

 

Upgraded Robot Displays with on the fly speed control adjustment screens on MP6 and MP2.  Only machines not running.

 

Picked up hose adapters for Dryer / Hoppers 1 ½ to 2”  to eliminate small hoses.

 

Picked up keys for Mike and Josh

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Saturday, August 21, 2010

August 21, 2010

Me and Gary set up Dukane welder with new fixture and new Branson Horn.  Located, drilled and tapped for new fixture.  Shimmed fixture .080” to get closer to parallel horn to part.  Dropped down stop to just above main part body.  Started with .8 weld time and could not tear weld with pliers.  Weld was very Hot, some weld slag visible on part.  Reduced weld time to .6 sec, still welding all around. Parts look better.  Run 30-40 parts, looks good.  Turned over to production.  Have a Nice Day!

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Friday, August 20, 2010

8.19.10 D shift

Dr#2- installed the motor from the dryer on the trailer. Found that OL's were bad also. Replaced them and checked operation, O.K. to run. Also replaced the regen contactor on it as well.

Mp#17- Cleaned up oil and replaced absorbent.

Replaced the pressure gage on the fan housing destructive tester. Evidently someone needed it.

Cleaned up in maintenance shop and hauled out the trash and cardboard.

Submitted a PTO day for September 7th, 2010.

Call if there are any questions.

Thursday, August 19, 2010

August 19, 2010

August 19, 2010

 

Upgraded MP 25 with new core sequence program.  Changed P-ROM chips.  Tried out works fine.  Cores “off” , Special Core Seqence “on”.

 

Flipped Slide cyl on gate cutter tooling over for clearance.

 

Worked on Matsui Dryer Hopper DR53.  No display.  Check fuses, power, relays, run/stop switch,  think it needs new board.  Will call Matsui tomorrow.

 

Worked on Cinci Dryer in shop.  Getting overtemp alarm on bed shift.  They were trying to run it at 130 degrees for Acrylic.  Raised the temp to 160 and overtemp to 35, had no problems.

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Test

Trying to get Mike set up

 

  Joshua Ledbetter

  Molding Maintenance Manager

  Manufacturing Engineer

  Oreck Manufacturing Company

  931-239-3235

 

8.18.10 D shift

Mp#15- Replaced nozzle heater band at Roy Smith's request.

Replaced bad contactor on the thermolator that was in the shop. Green tagged it and placed back in the auxilliary equipment area.

Made a fixture for the intake pivot to be drilled out at the mounting tab. The hole was flashed in and several had to be reworked, at Marty's request.

Repaired the web-trak sensor cable on the compact cannister hotstamp press. The cable had rubbed into the heater plate melting through it.
Soldered and tied it back up neatly.

The dryer in the shop needs the process blower changed out. I didn't see one in MRO so I plan to take the one from the dryer on the trailer out back to repair it. Also changed out the bad contactor in it.

Call if there are any questions.

Sean

Wednesday, August 18, 2010

Branson Welder Setup

Branson Welder Setup with new horn and fixture is Weld Time .700 Hold Time .200 Trigger Press 4 Main Air 35psi.  Also tuned welder with current horn setup.

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

August 18, 2010

August 18, 2010

 

Replace thermolator on MP1.  Brought the faulty one to shop, not heating.

 

Set up old Branson 910IW Sonic Welder with new fixture and new horn.  Had to go with the BLACK booster, as silver did not have enough power to weld properly.  It is over by the other not used equip, back of molding. 

 

Helped Josh adjust MP21 Screw pressure to correspond with percentage on panel.

 

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Tuesday, August 17, 2010

August 17, 2010

8/17/10

 

Ordered switch for power feed on milling machine.

 

Ordered additional 3.6 volt memory back up batteries for mold machines.

 

Replaced mitsu contactor in mold machine in warehouse.

 

IRG trained Mike on hose crimper.  Made new hose for mold #76010.  Replaced hose.

 

Worked on MP10 sonic welder, had slight misalignment.

 

Showed Mike oil storage area to take spent filters to drain.

 

Replaced memory back up battery in MP4.

 

Looked at old hot stamp on MP20, need to schedule it down sometime to tear down and tighten connections from display to main board.

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Monday, August 16, 2010

8.15.10 D shift

Mp#5- Prefill alarm came up again. Added about 1350 bits to offset to zero tonnage value back out. Checked the other convecs and they did not need to be adjusted. Alarms cleared and it began working again without incident.

Worked on robot PM's this weekend. I was able to do them all except for the ones on MP#6 and #7 machines.

Call if there are any questions or I can help with anything.

Talked with Wayne McConnel yesterday, his number is 931-646-7853 for anyone who does not have his number.

Sean

Saturday, August 14, 2010

8.13.10 D shift

Worked on robot Pm's tonight.
Robot on 2,3,and 5 Pm'd.
Replaced the hopper sensor cable on #6 machine.
Replaced a nozzle heaterband on #2 machine.
Will resume tonight again.
Sean

Friday, August 13, 2010

" C " Shift

MP-2  The bottom core on the top cover mold is leaking. Bill Potter said they had to run it until tomorrow morning. I put some pads down.

 

I worked with Mark on the base plate eoat. It should be ready to start setting up; When ever they give us the press.

 

I set up the fixtures on the band saw in our shop & the saw in the molding shop to rework the cardboard.

 

I  cut & threaded some ½” pipe for molding techs.

 

 

 

R. Upchurch

Wednesday, August 11, 2010

8.10.10 D shift

Mp#1- Ronnie and I aligned the sled up using a dial indicator atop the purge sheild. Put the last cover on after tightening everything up. Bill said that no one was to touch it until Josh said it was ready.

Put the old screw and barrel from it back in the crate and located it on the storage trailor.

I labelled the #3 novatec hopper/dryer "waiting on repair parts" and put it in the auxilliary equipment area until we decide what we are going to do with it, so it would not be sitting around in the shop. I think we just need some new loader controllers and top hat assemblies to put them back online? We can buy something or rig something up? Let me know what you want to do.

If we can get the go-ahead, I can round up a lot of this stuff we are never going to use and gut the parts out of it and throw the rest in the scrap metal hopper. "5-S" style. See what you think.

Worked on Robot PM's. #20,#21, #22, #23,#24, and #25. I will submit the work order's Friday.

Call if you have any questions or want to make me laugh!

Sean

Friday, August 6, 2010

8.5.10 D shift

Yushin Picker project- Made some progress. The other relay interface box would not work. The controller pendant would operate the picker manually, but when I would try to put it into "Auto" with the Mold Open limit and safety gate signals jumped out, it gave a 5555 alarm, which was not found in the manual information.

Where I am now is, I put the 110vac transformer on the other relay box (the one from 18) and got it working again. Because that model of relay box indicates using the newer style pendants, and because that box supports features that the newer pendant has, I got the other controller cable to use with it when it comes back from being repaired. I do think we should attempt using the old style pendants unless we have a valid interface diagram for them. I contacted Yushin via E-mail for more specific information and am awaiting a response.

The Barrel for MP#1 did not come in last night.

There has been a molding meeting scheduled for Tuesday 5 and 6 pm.

Call if there are any questions.

Sean

Thursday, August 5, 2010

" C " SHIFT

I worked on the Classic fascia hot stamp. I got it set up with the small print pad. Randy is supposed to get us the QVC pad with the large print so we

  can locate & drill the mounting holes .

 

I also worked on the Eagle fascia hot stamp. I got the mounting plate cut to fit & transferred holes in the slots to the base. All that’s left is mounting

  the pad to the hot plate & set up.

 

MP-2  The top core on the top cover mold was bleeding off. I put a gauge on the valve & saw it was dropping out. They had it on core 2, so I changed

   It over to core 1 & it worked fine. Will need to check it out when they finish the run.

 

I touched base with security & receiving all day --- Still no sign of the barrel.  WT #*@*!!!!!!!!!!

 

 

 

R. Upchurch

8.04.10 D shift

Mp#18- Ran into problems using the interface box that was on it. It was first bringing up " 0000 " on the pendant display. When I checked for 24volts on the interface board, I was reading 52 volts. Shortly there after it blew a fuse on the 200 volt power circuit.
I took the interface into the shop along with the picker from 14 so I could work on it while they ran press 18.
I hooked up a 200vac supply circuit to it again and it was blowing those fuses as well, but not the ones on the intrface board, so I am looking at a bad transformer possibly on that interface.

Then I looked at the other interface and found a bad fuse on the board. I replaced it and followed through the relays on the diagram. I tested the picker out on it and it worked fine. I jumped out the option we will likely not use (injection verified) so it would not need a relay there. I labelled all the wires after tracing them back on the terminal strip and will put the SPI plug on it tomorrow and double check the wire connections in press #18 if it is down.

I will let you know how it goes.

MP#1-Ronnie is going to call me today when(if) the barrel comes in today and I will help him install it and get it going. provided we have all the parts.

Call if there are any questions.

Sean

Sunday, August 1, 2010

" C " Shift Weekend

MP- Robot kept stopping on “ Y “ axis. We found the over stroke block had moved.

 

MP-5  Robot CPU fault.  Mark pulled & replaced the cpu card & cleared the fault.

 

MP-20  Replaced the nozzle heater band & thermocouple.

 

MP-16  Ejector cylinder bolts broke; Found  1/8”  difference in the knock-out length.  Had tooling turn down knock-outs, replaced eject. bolts,

      & made a new eject. switch bracket.

 

Ordered more brass compression fittings from Nissei. ( for tie bar lube )

 

MP-5   Core 2 Leaking at manifold. Removed the fittings and put new Teflon on.

 

MP-6 thru 12  Vacuumed out oil pans.

 

MP-3  hooked up core switches & hydraulics on funnel mold.

 

MP-26  The chiller return line ball valve is cracked -  the valve that comes out of the 4” line up top.

 

MP-3   The barrel end cap is leaking. I kept an eye on it so they could finish the run. At the end of  C  shift, they needed about 100 more parts.

          They’re doing a mold change tonight. The end cap needs to come off to clean & reseat; That is if it’s not cracked.

 

 

 

       R, Upchurch