Sunday, September 13, 2009
MP#13- robot and press settings.
Including part drop detect on the press and robot were both turned on. The machine would cycle only once and stop because of this.
For future reference MD4 should be "on" for the robot not to look for part and "drop should be set to zero (off) on the press, NOT to look for part.
Sean 9/13/09
Saturday, September 12, 2009
Press#3 Oil Leak
Sean 9/11/09
Sprue Pickers
Collin and I put one on press#17 and Press#14 Friday night.
Press# 16 is next for a 550. Then I was going to put 900's on 18,19, and 20.
Ronnie said that press22 was going to move soon so we will hold off until then. (With a 750).
Building adapter plates as we go for now since each machine must be uniquely fit and are drilled different.
The interface schematics are on the table in the shop next to the good 120vac interface box.
Josh is supposed to be getting more in soon.
Sean 9/11/09
Friday, September 4, 2009
New Equipment Update
As you may already know, we bought some new equipment yesterday. If you include the shipment of used sprue pickers, dryers, and blenders we got this week, here is where we stand- We have 7 sprue pickers, 3 mold machines, 5 robots (maybe 6), 3 dryers, 4 dryer/hopper/loader combos, 7 conveyor belts, and 2 blenders to get installed and running. PLUS- keeping the floor running, Eagle and Pilot launches. The next few weeks and months should be pretty crazy around here.
This stuff won’t ship until the week of the 14th. Until then we need to be finishing Eagle and Pilot projects and working on new robot installations. Once the new equipment gets here, priority shifts to getting the three new machines running with robots and support equipment. Then we will focus on the remaining robot and aux. equipment installations.
OF THE SPRUE PICKERS WE GOT THIS WEEK- Most of them are located in the storage trailer next to the pallet room. I have 5 more pendants coming next week. We need to pick out the best of the following sizes- (3) 550 models, (2) 750 models, and (2) 900 models. They will go on MP’s 14, 16, 17, 18, 19, 20, and 22. Get them in the shop and de-bugged and then see what needs to be done to mount them on the machines. We should probably save a couple of the remaining pickers for future use and rob spare parts off the others. I will work on the machine interfaces. We are going to need all the spare room we can for new stuff coming in.
Contact me with any questions. Just dig in and I will keep all of you updated.
Thanks for all your efforts.
Joshua Ledbetter
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
Thursday, September 3, 2009
Water System
Tuesday, September 1, 2009
MP4 Robot Stopping
What is causing MP4 to stop with the robot above the mold and the machine displaying “Eject Forward Permission Not Made” alarm is this-
When the clamp opens fast, the ejectors are drifting past the eject retract set point (Menu 41, Input 121). The robot will not go into the mold without this input. We will repair the drifting problem asap, but in the meanwhile, make sure your retract set point is back far enough to compensate for this.
Thanks
Joshua Ledbetter
Manufacturing Engineer
Oreck Manufacturing Company
931-239-3235
Monday, August 31, 2009
DR-7 Breaker out in Mezz room.
Sean
D-shift core problems on #10.
The symptom was that the set switch would not make at first try in manual, but, when you set it the second time it would make.
I went through checking for loose connections, replaced the switch, and the relay module (110vac), but no change.
We found that pressure was only 500psi.
Although no adjustments had been done on press#10, we adjusted V225 pressure relief valve to 1550 and had no further problems.
This is interesting because the press was running when the fault occurred.
Sean
Sunday, August 30, 2009
"C" Shift
Well, they jammed another grinder with santoprene . I spent 2 hours disassembling the grinder. It’s going to take awhile to clean this one out.
I spent most of the rest of the day trying to finish up PMs.
R. Upchurch
C - Shift
Saturday, August 29, 2009
Another test
I entered my profile info into the google blogger so my name should automatically appear now when I make a posting.
Sean Kearns
Maintenance Technician
Oreck manufacturing Company
931-239-7671
Posting Instructions
Also, if anyone is interested I can also set up your cell phone where you can easily post to this site by sending a text message to 256447 (BLOGGR). It will post your message just as it would an email to the log address.
Thanks
Josh
test
Hey guys,
Just trying out the new blog--------
There’s not a lot going on today, just trying to get PMs done.
Later………………….