Friday, January 21, 2011
1.21.11 Dshift Sean
Worked with techs on programming #22 some more.
Cleaned up around the shop some.
Call if there any questions.
Good luck with the IML today!
Sean
Wednesday, January 19, 2011
Ronnie Upchurch
Weekend !/14 – 1/16/11
MP-8 Replaced mixer loader hoses with the copper wire lined hoses to cut down on the static that affects the controller.
MP-5 The zone 2 barrel heats dropped out; the mercury contactor went out. Replaced it.
Also the “Y” axis encoder was acting up. It was loose at the shaft coupler.
MP-19 One of the bolts on the rear screw flange broke off, & the other two were loose. Removed the broken one & replaced all three with new bolts & “anti-seize”
MP-16 Large blow back; I cleaned it all off & disassembled the nozzle. I had tooling resurface the end cap & nozzle adapter. Had to do some body work on the covers
& align the sled.
MP-12 The right side palm button on the welder came loose. The mounting nut inside the box was broke, also the guard was missing. Replaced.
MP-7 Blow back- Mark caught it when it happened, but it was still packed & hard. ( Nylon ) Cleaned it out & replaced the nozzle band.
Assembled a work table for Potter.
Tuesday, January 18, 2011
New Sonitek Heat Stake
FYI-
The Password for the new Sonitek Heat Stake is 84.
Thanks
Joshua Ledbetter
Molding Maintenance Manager &
Manufacturing Engineer
Oreck Manufacturing Company
(C) 931-239-3235
(F) 931-646-7615
Monday, January 17, 2011
1.16.11 weekend D shift - Sean
MP#13-Friday replaced the nozzle. The Nozzle was the cause of the bleed-offs. It was not seating off where the nozzle tip attached.
Mp#19- Wired in the ejector back limit switch and checked operation. Good to go. They ran the production out on that tool and because there were no more male core plug inserts, Ronnie used the adapter to temporarily jumper it out to run with out cores.
Mp#10- Replaced a broken sensor on the nutpress, and removed a piece of foreign hardware from one of the nut channels.
There are 3 dryers in the shop at this time. The 2 Conairs have bad boards. The Milacron dryer has an Overtemp problem to which the cause has not been identified yet.
The 230 VAC Matsui has been shrink wrapped and indentified "NOT FOR USE". It is located in the Trailor out back.
Worked on End of Arm Tools off and on all weekend. When Josh gets better we need to get him to put on a training seminar for all the techs on how to run parts with more than one cup! Just kidding...their pros!
Anyway call if you have any questions. Have a great day.
Sean
Friday, January 14, 2011
MP26 TC
Mike had to Jerry Rig the Zone 1 Thermocouple on MP26 the other night because of a blow back. I have a new one with the TC Well ordered but there is a two week lead time. Also ordered end caps for 25 and 26- should be here any day.
Joshua Ledbetter
Molding Maintenance Manager &
Manufacturing Engineer
Oreck Manufacturing Company
(C) 931-239-3235
(F) 931-646-7615
Tuesday, January 11, 2011
Jan 11, 2011
Tuesday, January 11, 2011,
Square nuts on MP10 are contaminated again with a sticky goo. Remove track covers and nut from bowl, clean with mold cleaner, scotchbrite and Potter washed and dried nuts.
Current sensor fault on MP14, on nozzle. Tightened screws on nozzle contactor. Contactor could be going bad.
Order more components for new fan housing test station. Sketched up station frame and layout for station.
Getting organized with files for projects, cleaning up some.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Friday, January 7, 2011
MP05
The Core Problem on MP05 ended up being in the Output Card Plug itself. J1 on the plug is the +24VDC for the first four outputs. If you took the plug off and looked at it, the pins in the socket were broke on one side and bent back on the other.
Thanks
Joshua Ledbetter
Molding Maintenance Manager &
Manufacturing Engineer
Oreck Manufacturing Company
(C) 931-239-3235
(F) 931-646-7615
1.6.11 D-shift...Sean
I swapped out cards, solenoid coils, checked power supplies (except under load when problem occurs), ohmed out each contact on card 6's terminal strip back to common strip.
Checked the 235 contactor contacts and voltages (safety gate relay). The last thing I did to get it running again was to spray out from behind the backplane with dustoff.
Also checked for loose wires in the core switch boxes...although signals were present anyway.
When it malfunctions, it simply does not indicate on the board that it is outputting a signal. It is running now but thats where I was with it.
DR 23- The Milacron dryer was overtemp1 alarming. I went through the normal checklist and the only thing I noticed was that the cabinet fans were not working due to the faulty temp switch that controlled them. I jumpered the switch and it seemed to have fixed it.
Call if you have any questions. Good weekend to all!
Sean
Thursday, January 6, 2011
Jan 6, 2011
Thursday, January 06, 2011,
Finished conveyor docking on IML automation cell.
Worked w/ Randy Russell on new Bag Dock Heat Staker station design. Gathered materials for job.
Worked on materials for new Fan Housing Tester.
8 and skate today.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
1.5.11- Dshift...Sean
I pretty much went over everything looking for a loose connection and really didn't find anything...so it made me ask if the output card had something getting hot and cutting out? Then after awhile, it was cooling down and working again? We'll see?
Mp#23- was giving an 32036 alarm involving the ejectors possibly "timing out too soon?"
we put some cycle start time on it and slowed down the ejectors and it seemed to have went away.
I sent a molding support workorder regarding sled skate strips coming out. FYI. Need to find a way to keep that brass under there...open for suggestions.
Worked on PM #9- press and robot.
Have a good day.
Sean
Wednesday, January 5, 2011
January 5, 2011
Wednesday, Jan 5, 2011
Put MP13 back together, broken butterfly bolts, had to extract one screw. Knockout bars were different lengths. I noticed that the butterfly plate has been welded on and the bolt heads have to be turned down to enter the counterbore, so I think we should order a new one.
Wired the conveyor up for the automation cell for IML, working on the docking locators for it. Received the locate and shuttle tooling from Star.
Made a list of tooling that needs to be made for Josh on the new fan housing tester. Need to order the rest of the purchased item tomorrow.
8 and skate today.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Monday, January 3, 2011
1.2.11 - D-shift Sean
Robot and Press#5 tonight. The Y-axis lower pulley was bent and scraping the arm. I tried straightening it and using longer screws and nuts behind them. It didn't seem to help much so I added a right angle bracket to help brace it better.
It repair works... but... the drawback is that it shortened up the distance the Y-axis goes fully up by about 2cm. I had to adjust the Y-home switch for the repair also. It does clear the tiebars and door when traveling out the beam though.
Now we are getting ready to run it. Also used a hand grinder to clean the drag marks and burrs from the Y-arm.
Other than that, worked on regular start up stuff, nothing major.
Call if there are any questions. Have a nice day!
Sean
Thursday, December 30, 2010
12.29.10 - D shift - Sean
Nothing Major happening worth mentioning.
Hope next year goes as smoothly as tonight did!
Call if you need bailed out of jail! Happy new year team!
Sean
Tuesday, December 28, 2010
12.27.10 - D shift Sean
MP#21- Bleedoff at Nozzle. Took out 3 heaterbands and thermocouple. Looked like the sled forward switch had worked loose causing the problem. Had no more trouble after we started it back up.
Mp #2- Zone 3 had a bad band. Replaced it. Replaced the fuses and checked operation...O.K. to run.
Continued with PM's. Worked on #10 press and robot tonight.
Call if you have any questions. Have a successful day!
Sean
Monday, December 20, 2010
12.19.10 D shift Sean
Continued working on PM's.
Need to order some cabinet fans again in 120VAC.
Have a great day!
Sean
Sunday, December 19, 2010
12.18.10 D shift - Sean
Had an issue with #23 ejector encoder was not reading right after they set a mold in it.
I changed the offset on the VRE encoder offset and it started working correctly. I did check to see if anything was loose on the encoder first but it appeared tight.
Sean
Thursday, December 9, 2010
Ronnie Upchurch
12/08/10
Worked on fascia hot stamp.
MP-13 Pulled barrel cover & cleaned off blow back – ¾ down the barrel. I was able to save heater band wiring & the covers , with some minor body work.
MP-19 The DME t.c. was reading low , but the mold heater was running away. I found that the t,c, wire had been pinched behind the mold clamp. Replaced.
12/09/10
MP-13 Pulled the Conair heater to get the part #. There were two possible numbers for that model. I ordered replacements . There are only two heaters
Per zone – 240 v.
MP-10 We cleaned out the nut feeder , Again , & cleaned a box of nuts. Mark adjusted the tracks.
MP-26 The center knock-out mounting stud on the eject. plate fell off. Reinstalled.
I ordered a new adjustment screw & nut for MP-24 spacer adjustment.
I sent the top cover drill out for repair.
I ordered a new replacement motor for the small Solo grinder.
Wednesday, December 8, 2010
MP05 Robot
MP05 Robot has been stopping the last week or so randomly with a “Mold is not open- Robot in Unsafe Position error”.
ANYTIME you get this error it means that the mold is not at it’s Open Limit and also the robot is not on either the Y-Up safety switch or Z-Out Safety Switch.
The Power Supply was low and what was happening was the 20 VDC that made it back to the coil on RYS or RZS would allow it to drop out one or both of them every now and again.
Mark adjusted the PS up to around 26VDC and fixed the problem.
Thanks
Joshua Ledbetter
Molding Maintenance Manager &
Manufacturing Engineer
Oreck Manufacturing Company
(C) 931-239-3235
(F) 931-646-7615
Monday, December 6, 2010
12.5.10- Dshift Sean
Worked on PM's.
Replaced damed plugs on #10 connector mold from where it had been damaged before.
Made some adjustments to the nut press so nuts would slide down correctly.
Started making another component for the fan mold in #25, to grip instead of using the vacuum cup. (Requested by Darryl B.)
Call if you have any questions.
If you are reading this it is because I did post a blog...reciprocate the info!
Knowledge is power! Share the wealth!
Thanks,
Sean
Sunday, December 5, 2010
Ronnie Upchurch
12/03/10
MP-25 Replaced a broken air quick connect fitting on robot eoat.
MP-10 Added hydraulic fluid.
I helped Josh & Mark get old press 13 moved out.
I replaced the pneumatic drill on the top cover fixture. I will send the broken one out for repair.
12/04/10
Moved the home sensor block over some for the single cavity connector mold.
Worked on the degate & lable fixture in shop.
MP-5 The tech said that core 2 on the top cover mold wasn’t pulling. I found the bottom core not hooked in to the cylinder.
12/05/10
MP-22 PMed the robot.
I mounted the motor on the polisher test fixture table. It’s the one they test the brush pans on.
Cleaned up some in shop.