8.8.11 D-shift Sean

Mp#3- replaced the oil filter. Cleaned the oil filter clog sensor. Installed both strainers and cleaned tank with rags some more. It is ready to refill ,etc.

Assisted process techs some tonight.

Continued with PM's.

Sean

Sunday, July 31, 2011

7.31.11 D-shift Sean

Worked on the Milacron dryer again, I found a loose connection on the control board, one of the IC chips was not seated very well. Reconnected and ran for a few hours without further problems.

Have a great day.

Sean

7.30.11 D-shift ...Sean

Mp#3- FHD current #1 alarm, found pump overload tripped, reset it and checked operation.

Mp#10- Nut press was not vibrating. Found sensor on RH side is bad, lens on it appears to be etched from solvent and will not focus now. I could not locate a replacement in MRO, so we may need to order a new one. Tricked it out so that it will still run from the LH side only. Posted a reminder on the PM board also.

Continued with PM.

MP#1- still running, will install the temp switch in the tank on auxilliary hydraulic power unit when it goes down next. I posted a reminder on the PM board in case A or B shift catch it down next.

Call if there are any questions. Have a nice day.

Sean

Wednesday, July 27, 2011

7.26.11 D-shift sean

Mp#5- Tank cleaned out, filter changed, and filter-clog sensor cleaned out. Ready to refill.

Continued with PM's.

Mp#25- needs a hose on back of clamp. I will submit measurements for it on Friday.

Call if there are any questions.

Have a good day.

Sean

Thursday, July 21, 2011

7.20.11 D-shift Sean

Mp#2- Power supply in 486 controller quit working. I put the one out of press#4 in it and it has been running fine. The one from MRO did not work. I also tried it in#4 and it did not work either, the 12v shuts down after a few minutes with power applied to it.

GR#1 - replaced the rotating knives and the bed knives. Checked operation at press #5, O.K. to run.

The auxilliary hydraulic core unit for MP#1 got really hot so I shut it down to cool off, Mark is looking for the schematics for it, likely something is not relieving properly.

Sean

Saturday, July 16, 2011

Saturday July 16, 2011 D-shift

The grinder on press #12 had the blades rubbing when I came in. I adjusted the bottom stationary blade. Checked operation, O.K. to run.

Cleaned out all of the robot control cabinets and replaced the raceway covers inside.

Continued working on PM's most of the night. Cleaned up oil under #8- it just looked like it had been there under the clamp a long time, not leaking anywhere. Painted the area around the valves, under the clamp.

Have a great day!

Sean

Sunday, June 19, 2011

6.18.11 weekend D-shift Sean

Mp#4- Steemer Nozzle Body Mold
Had problems with the core 1 set limit flag being missing, not allowing sensor to pick up the set position. No way to fix it right without pulling out the mold. I made a tooling work order and posted it on the machine. Advised the technicians to use the timers or pull it out. They later had trouble with the part sticking in the front of the mold and thought it was the core not pulling completely. I was able to process it to where it stopped sticking for the most part. Gil looked at it and said they would get to it when itcame out.

Vacuumed up oil and cleaned up oil that was on the floor around the presses. Continued with PM's. Cleaned up in the shop also.

Installed several more of the lockout mechanisms for the pump motor E-stop switches. Only have about 3 or 4 left to do now.

We are shutting down at 6am Saturday morning due to the schedule change. Give me a call or send me a message if you need me in an extra day this week, otherwise see you Wednesday.

Sean

Tuesday, June 14, 2011

6.13.11 D-shift... Sean

Mp#2- Runaway nozzle temp. Mercury contactor looked like it had been pushed sideways some. I straightened it up, no further problems, but, I did look in MRO for another solid state relay to replace the contactor and did not find anymore.

Mp#4- replaced 24V4 fuse, Jason said that it got blown during a mold change, inspected it and found no smashed wires or anything.

Worked on PM's and changed out some of the E-stop switches to add the lockout feature for Walter.

They were running MP#3 so I could not continue with the current sensor installation.

Call if there are any questions. Have a nice day.

Sean

Monday, May 23, 2011

5.22.11 D-shift Sean

Mp#10-
Worked on the nut press for the connector. The nuts that were loaded into it were oily and I had to tear it down and clean everything. It may still need some minor adjusting where the track runs into the press on the right side.

Continued with PM's.
I have been cleaning the water filter screens out, they are very dirty right now.

Have a great day.

Sean

Sunday, May 22, 2011

5.21.11 D-shift Sean

Mp#11- Replaced the A-axis sensors an wired them in, found where A-home had also been jumped in the cabinet. Put it back correctly and checked it out thoroughly, good to go now. Not that we use the A- axis much, but recently we could be using it to separate parts with two sides, etc.
The guide-rod under the clamp cylinder came off, just needs to be put back on when it goes down again.

Bill said one of the loading system pumps gave them trouble today, gasket got sucked out causing lost suction on press 18.

Mp#1- Extruder started messing up and tripping the servo alarm. Took the panels off and discovered the lube had run dry although the grease tube holder appeared to have grease, it was not compressed by the spring. I replaced it and also had to clean out the screw threads and regrease them by hand. Got everything working again and then shot every fitting full of grease I could find. O.K. to run.

Note: The process techs or whoever cleans out the hoppers needs to stop blowing dust and material all over #1. It had plastic worked into the ball screw threads so bad it looked like teflon tape. It has not been that long since I cleaned it out last time.

Replaced the nozzle band on #21 at the techs request.

Mp#2- Zone 3 quit heating. Checked heater bands, thermocuople, found that the wire to the coil on the mercury contactor was loose. Tightened it up and checked operation, no further problems.

Have a nice day.

Sean

Monday, May 9, 2011

May 9, 2011

May 9, 2011

 

Worked with Gary on part present sensors for R2 Facia

 

MP1 clamp making noise removed guards at the end of machine, found broken screws in motor gear, gear had slid, belt hanging off, removed broken screws, pulled gear back in place, tighten bolts, greased all fittings on that end, replaced guards, looks OK

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Week of May 2nd, 2011

Week of May 2nd , 2011

Replaced FHD board and pressure transducer on MP5.

Rebuilt sled cylinder on MP20.

Ran High Voltage lines on MP22 product arm. Provide means for easily
disconnecting EOAT on insert side.

Valves for Mezanine purge valves are on table.

Conair dryer push button touch pad is on table.

MP24 was faulted and would not clear the error. Ended up switching from
manual to auto and back and then reset cleared.

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

Cookeville, TN 38506

mmckee@oreck.com

PH 931.646.7856

CELL 931.644.5289

FAX 931.646.7615

test

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

Wednesday, May 4, 2011

5.03.11 D-shift

MP#20- Changed out all 3 heater bands on the nozzle. Nozzle bleeding back at sprue after just a few shots.

I changed the sled pressure sensor and adjusted it. Still continued to bleed back. Changed the nozzle tip out and checked alignment, had problems where the shims had come out.

I made some new ones with the material we had in the molding projects cabinet. Put them on, adjusted sled alignment again, checked operation, appears to be doing fine now.

Mp#4- Repaired wires on Core 2. Replaced the entire cable which was too short anyway on the Steemer Nozzle Mold.

Continued with PM's.

Call if there any questions.

Sunday, April 24, 2011

4.23.11 Weekend D-shift Sean

Mp#5- has some problems with the clamp. When it opens it opens as though tonnage pressure has not be released well and it slams open shaking the entire press, enough to cause the robot to loose control power briefly.

Mp#20- Changed out a nozzle heater band and repaired a T/C connection.

Worked on the R2 Fascia Project some more. It is now on the table in the shop.

Cleaned up the shop and put some new tape on the floor in places. Took out the trash, etc.

Have a great Easter Weekend! Call if there are questions.


Sean

Tuesday, April 19, 2011

4-19-11(Mike Daniels)

Changed contactor on mp21 front zone.

 

Mp6 adjusted clippers on eoat they where gouging part.

 

Mp1 stopped a few times with a inj. Axis overload (overheat) alarm. Found bad fan in control cabinet replaced it haven’t had anymore problems from it.

 

Assisted techs.

 

Mike Daniels

Technical Specialist

Oreck Manufacturing

1400 Salem Rd

CookevilleTN  38506

Cell 931.287.6252

 

Eat. Sleep. Fish.

 

4-18-11

Mp16 removed nozzle tip and adapter because it was leaking between the two. Cleaned and milled surfaces and reinstalled.

 

Worked on PMs

 

Swept shop

 

Mike Daniels

Technical Specialist

Oreck Manufacturing

1400 Salem Rd

CookevilleTN  38506

Cell 931.287.6252

 

Eat. Sleep. Fish.

 

Monday, April 18, 2011

Ronnie Upchurch

MP-3  Replaced one rear zone heater band & nozzle tip band.

 

MRO-  Sorted out parts on west end shelves- ( non stock items ). Made some of them stock items, Moved some to trailer, & threw the rest out.

 

MP-7  The nozzle contactor may be about to go out. Tech called me to the press & said the nozzle wouldn’t heat. When I opened the cabinet to check it out,

         The heats started working. I f it quits again, I’ll change it out.

 

MP-18  The hot stamp heat was cutting off. I checked the T.C. connection & checked for any other loose connections. Put it back together & turned it on,

      OK for now.

 

MP-5  The hot stamp foil jog motor is indexing slow. It’s keeping up. Didn’t get a chance to check it out. Maybe it will hold out till they finish the run &

        give us time to work on it.   

 

Friday, April 15, 2011

Program change on MP3

Since the mold was broken by eject retract with a part still on it.  Temporarily we have changed the PLC program on press 3 with added safe guards to prevent mold from retracting the ejectors if the you do not have vacuum confirmation and there is a back check on the vacuum sensor to make sure the switch is adjusted properly.  Multi-eject, Y up after eject,  and eject retract before X back has been disabled.  We will work on a better solution as time allows.

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 

FW: Good Friday

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7615

 


From: Jerome Flowers
Sent: Friday, April 15, 2011 4:17 PM
To: Mark McKee
Subject: Re: Good Friday

 

Hey Mark

I forgot to tell you. We are working Friday and taking off Sunday for our Holiday.
Jerome Flowers
Molding Manager


From: Mark McKee
To: Jerome Flowers
Cc: Ken Paschall
Sent: Thu Apr 14 05:09:55 2011
Subject: Good Friday

What is the molding schedule for the Good Friday weekend.  I need to communicate this to the guys.

 