" C " Shift

   MP-7     Loader not pulling material --- Hopper feed at mezzanine not opened all the way.

 

   Vibratory welder -  Had filter clog alarm ;   Installed new filter .  cleaned up all the parts & oil under welder & on top of tank.

                            I let the oil heat up & cycled it several times ;  found one leak at press. gauge fitting & another at tank lid mounting bolt.

                             After it runs awhile , I’ll check it again.

 

  MP- 25    I emptied the oil jug @ injection end of press;  this was the second time in two weeks it has over flowed . It looks like it is coming from

                 the  injection cylinder . Will need to order parts & schedule down time for repair.

 

 

         R.Upchurch

         Molding Maint.

Thursday, December 31, 2009

#5 Had a fault FHD1 analog input 5 exceeds limits.Took pressure transducer off #3 injection unit and put it on #5 clamp. parts will be monday for #3.
Replaced belts on grinder #19.Put a new gripper on #22

Wednesday, December 30, 2009

12.29.09 night shift

Changed several heater bands on #3 at Bill Potters request. Also repaired some of the wires and re-did the paint on the barrel shroud. Checked it and it came up to temp fine.
While it was down went over some of the leaks and cleaned it up in general.

#16- had a problem with ejector back limit switch...it needed adjusting, it was making the clamp sound really awful when it closed up, and also would not lockover and build tonnage.

#4- made a new core cylinder hydraulic hose.

#5- replaced a core line quick connect and tightened all the lines up. It looked like the two fittings on that block really needed those o-ring/washer sealed types of fittings but I didn't find any to replace them with.

#11- has several leaks but is #1 priority on the schedule, so I attached work orders to the machine...1 for the tool and one to let the techs know to notify us when it is down so we can fix those lines above the clamp cylinder (ejector line fittings).

Call me if there are any questions!

Sean

Tuesday, December 29, 2009

12.28.09 night shift

MP#5- Mark and I put the pump in and I started it up. I ran around 40 shots of baseplates through it and shut it down. It is working fine. I then put the tool arm back on the robot and referenced it. Had to locate the loose plug connection in the controller first though because it would not power on at the pendant. It should be ready to start up this morning if they want to run it.

#11- has stopped a few times (4 or 5) throughout the night from 3217 alarm...which I think is the core switch signal...but when checking it out further, the signal IS made... so?? It starts right back so we have been keeping it going.

#2- The sled cylinder coupling was ran out too far and loose...I adjusted it and tightened. It was causing the frame to twist very badly when the sled was ran back all the way.

#25- Initially Mitch had made me aware that Zone #2 was over heating by 30 or 40 degrees. We found later that the feedthroat was partially blocked from old Nylon and liquid color residue. It kept slipping while building up a shot and taking much longer. While it was not running the barrel temps maintained and stabilized. After we cleaned it out it was fine. I also helped them process out the splay problem...they were short handed.

I came in early at 3pm so I am leaving at 4 am. Mark said he must leave early today so I may also come in early today.

I put the straps for Bill Potter in a box with his name on it in the Molding Office so he would find them.

Call if there are any questions.