Wednesday, August 25, 2010
8.24.10 D shift
I went through presses 6 through 11 and installed a gard so they do not push the trolleys into the robot power plugs.
Installed runner chute from aluminum onto the grinder on #11 because Marty said that Wayne does not like cardboard and tape.
Put the one-shot loader on the Nova-tech hopper/dryer #3 and put it back into operation. Looking at wiring up something to make use of the other top-hat on the table in the shop.(maybe put it on the hopper that is on the trailer?
Worked on PM's tonight, will continue through the weekend.
Call if there are any questions.
Sean
Tuesday, August 24, 2010
" C " Shift
I vacuumed out the rest of the oil pans & emptied the waste oil drum.
I installed the QVC fascia pad & set up the hot stamp. The pad isn’t contoured to the part, so it took a lot of shim tape. They changed the location of the artwork
AGAIN !!!!! I located the new pad so they can change back to the old one without moving the mounting plate.
R. Upchurch
Monday, August 23, 2010
" C " Shift
MP-23 & 25 Replaced broken lube fittings – ( tie bar & skate )
MP-14 Replaced broken ¾” water supply line on thermolater.
MP-8 Blender regrind valve not opening; may be static causing the controller to lose set points. Will try a ground wire on it.
Cleaned out oil pans on MP-6 & 7.
MP-25 Lost ejector back position; Mark & Jason adjusted the encoder.
R. Upchurch
August 23, 2010
8/23/10
Added Flow Controls to MP10 ‘s Dukane Welder Door Ext. Need to move prox down to clamp close on fixture and eliminate door plumbing to reduce shock and vibration dislodging deflector on part.
Worked with Elaine on out of stock flow controls.
Upgraded Robot Displays with on the fly speed control adjustment screens on MP6 and MP2. Only machines not running.
Picked up hose adapters for Dryer / Hoppers 1 ½ to 2” to eliminate small hoses.
Picked up keys for Mike and Josh
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615