Worked on robot Pm's tonight.
Robot on 2,3,and 5 Pm'd.
Replaced the hopper sensor cable on #6 machine.
Replaced a nozzle heaterband on #2 machine.
Will resume tonight again.
Sean
Saturday, August 14, 2010
Friday, August 13, 2010
" C " Shift
MP-2 The bottom core on the top cover mold is leaking. Bill Potter said they had to run it until tomorrow morning. I put some pads down.
I worked with Mark on the base plate eoat. It should be ready to start setting up; When ever they give us the press.
I set up the fixtures on the band saw in our shop & the saw in the molding shop to rework the cardboard.
I cut & threaded some ½” pipe for molding techs.
R. Upchurch
Wednesday, August 11, 2010
8.10.10 D shift
Mp#1- Ronnie and I aligned the sled up using a dial indicator atop the purge sheild. Put the last cover on after tightening everything up. Bill said that no one was to touch it until Josh said it was ready.
Put the old screw and barrel from it back in the crate and located it on the storage trailor.
I labelled the #3 novatec hopper/dryer "waiting on repair parts" and put it in the auxilliary equipment area until we decide what we are going to do with it, so it would not be sitting around in the shop. I think we just need some new loader controllers and top hat assemblies to put them back online? We can buy something or rig something up? Let me know what you want to do.
If we can get the go-ahead, I can round up a lot of this stuff we are never going to use and gut the parts out of it and throw the rest in the scrap metal hopper. "5-S" style. See what you think.
Worked on Robot PM's. #20,#21, #22, #23,#24, and #25. I will submit the work order's Friday.
Call if you have any questions or want to make me laugh!
Sean
Put the old screw and barrel from it back in the crate and located it on the storage trailor.
I labelled the #3 novatec hopper/dryer "waiting on repair parts" and put it in the auxilliary equipment area until we decide what we are going to do with it, so it would not be sitting around in the shop. I think we just need some new loader controllers and top hat assemblies to put them back online? We can buy something or rig something up? Let me know what you want to do.
If we can get the go-ahead, I can round up a lot of this stuff we are never going to use and gut the parts out of it and throw the rest in the scrap metal hopper. "5-S" style. See what you think.
Worked on Robot PM's. #20,#21, #22, #23,#24, and #25. I will submit the work order's Friday.