Thursday, January 19, 2012

1.18.12 D-shift Sean

Dr#9- had some fuse blown and bad contactor. Removed the dryer from the mezzanine and put a 200lb dryer in its place. Dryer is in the shop now, work has been done, it just needs to be checked out. I will finish it tonight.

MP#4- 8:00pm -Nozzle heaterband was left with a bleed off on the nozzle tip. I replaced the heater band and thermocouple at Roy Smiths' request. Then at 11:45 Roger asked me to check out the mold heaters which were showing OPi on all of them. I found that the plug at the top of the mold had been smashed down and was not making contact. Replaced it and labelled all the wires inside, then checked operation. At 5:00 they informed me it had filled up the sprue with plastic and had run no parts on it yet. It was the number one priority on the schedule. I did not receive any work orders from any of them. I will write some tonight.

Mp#7- chased out some holes in the bag dock tool, installed new screws with loctite per rogers request. Assisted Roy Smith in getting the Robot going at his request.

See ya tonight. Have a very safe and productive day.

Sean



Sunday, January 15, 2012

1.13/14.12 D-shift Sean

Mp#20- Changed nozzle band, aligned sled after removing the shims that were messed up.
the clamp position switches got raked when the mold setter left some clamps near them and closed the mold up. I replaced 2 and fixed the others. Also cleaned and pm's the press.

Mp#24- wired up 2 heater bands on the nozzle at Roy's request.

Mp#1-Conveyor started messing up, it appears to be the gearbox or roller, I'll check it out more tomorrow. I swappped out conveyors for now.

Mp#9- robot relay contacts for conveyor was burned up. Replaced 24vdc relay.

Word on the floor was that one of the operators was throwing scales around.?? They asked me to find another scale for them, Roger and I located one in MRO. The broken one is back in the shop again.

Mp#3- blew a 2" flange hose. Ronnie got it replaced Saturday.

It is really cold this weekend!

Sean