Wednesday, July 28, 2010

7.27.10 D shift

Mp#20- Changed out the motor starter...was bad.

Welded the tank for the handle project. It needs to marked for the chiller fitting locations and I will weld the nipples in place and anything else that needs done.

Mp#18- Installed the 120vac Robot receptacle. Fused for 5 amps and checked that E-stop killed power. Labelled everything.

Mp#2- Got an error E00240. We powered it down and when it came back up it automatically went into reloading from the boot card.

When it came back up it evidently did not have the core 2 programming saved on the boot card because it does not have the page on the menu.

It is operational right now as the mold in it is only using core 1, but likely we need to reinstall that.

Call if there are any questions, be back Friday.

Sean

Tuesday, July 27, 2010

" C " Shift

MP-18  Installed chain on dummy plug.

 

MP-22  The parts were getting black swirls.  We pulled the nozzle & adapter and got Fred to turn down the threads for a better seat.

 

MP-21   Put new heat shrink tubing on the large fan grippers.

 

We started fabricating the water tank for the Hokey handles .

 

MP-6-7-8 & 9  Vacuumed out oil pans.

 

 

 

R. Upchurch