12/08/10
Worked on fascia hot stamp.
MP-13 Pulled barrel cover & cleaned off blow back – ¾ down the barrel. I was able to save heater band wiring & the covers , with some minor body work.
MP-19 The DME t.c. was reading low , but the mold heater was running away. I found that the t,c, wire had been pinched behind the mold clamp. Replaced.
12/09/10
MP-13 Pulled the Conair heater to get the part #. There were two possible numbers for that model. I ordered replacements . There are only two heaters
Per zone – 240 v.
MP-10 We cleaned out the nut feeder , Again , & cleaned a box of nuts. Mark adjusted the tracks.
MP-26 The center knock-out mounting stud on the eject. plate fell off. Reinstalled.
I ordered a new adjustment screw & nut for MP-24 spacer adjustment.
I sent the top cover drill out for repair.
I ordered a new replacement motor for the small Solo grinder.