Saturday, December 5, 2009
Robot on #22- 12.5.09
I tried?
Sean
" C " Shift
I came in around 12:00 noon ; Randy Russell left the new pads & tape for the eagle top plate. I set up the hot stamp; got it close’ but need more parts.
I’ll get with Breland to see when he’s going to run some more.
12.05.09 nights
Set a tool in the press and tried to dry cycle it with injection unit off. It gave a "tonnage not building alarm" after timing out trying to close. It is going to need more convec tweaking. I did save new values to boot card and will again as progress occurs.
Ran out of time due to other issues but will resume again this evening if Ronnie doesn't come in.
The robot on #5 did not appear to need another encoder. It referenced and homed fine although it has not been tested in production yet.
Sean
Friday, December 4, 2009
This week
All vertical conveyors should be wired with star conveyor interface and with a manual run/auto toggle switch.
Screw tip for MP 5 came in today. It is a new 4 piece. I installed the tip and coupled the screw in back. Installed the endcap and nozzle tip and extension. We should check all bolts and nozzle for tightness when the barrel reaches the desired temperature. The nozzle is ready to be wired and we might think about turning the heats on one zone at a time.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
Tuesday, December 1, 2009
11.30.09 nights
Started putting together an End of arm tooling req.
Discussed new projects on the horizon with Mark.
Submitted tooling work order for some EOAT components.
Had some minor issues with the Ink Pad printer...was out of ink, we mixed some more up and it worked. We used a recipe for something else.?
#22- FYI- will not eject multiple strokes unless it IS in continuous mode.
They asked me to look at it because it would eject out forward and stop?
They were only trying it out in single cycle mode.
Sean
Monday, November 30, 2009
" C " Shift
Changed out dust collection drain tubes on Matsui dryers.
MP – 6 Changed speeds on “ Y “ & “ Z “ axis - Y from 7000 to 10000 / Z from 7000 to 12000
MP-5 Stoned rough edges on screw flights.