Thursday, July 22, 2010

7.21.10-

Mp#25- replaced bands on nozzle and 1st band.

Mp#20- Replaced 3 nozzle bands and reset sled pressure switch. Reinstalled shims under sled as well as i could . looking at a better solution for this repair but for now it is runnable.

Fabricated a detangler for the springs at baseplate sub-assy area. Will put it into use tonight.






Wednesday, July 21, 2010

" C " Shift

MP-11  Cores not working.  There was a bad spot in the cable. Replaced the cable & six pin plug. Rewired the bad one.

 

Mixer # 1   Replaced the air cylinder on the dump valve; next to the one that was replaced last week. It was getting weak.

 

I made the Eagle fascia hot stamp pads a stock item. It wasn’t done when Randy ordered them & there was only one spare. When the

  new pads come in for the hokey, I’ll get those put in stock too. Randy only ordered two.

 

 

 

   R. Upchurch   

Monday, July 19, 2010

7/17/10 weekend D shift

We have the Hot Stamp for the fascia cover working. Ronnie mentioned that someone needs to get another flat shaped "Oreck" hot stamp pad made because we used the ones for the HOKY which are curved.

Likely it will cause it to eventually wear out and then there will be none to replace it with.

It is in the shop.

Robot on #9- Rack and gear stripped out on the X- axis. I replaced them both and cleaned and greased the bearings. O.K. to run.

Mp#19- at 7pm on Sunday, we found the grinder completely full of santoprene from the handle overmold. It had not melted down yet but was on its way. The operator on our shift had put no runners in it yet because he was told that it was not working from the previous operator.

Mp#13- had a water leak and water got into the ejector valve cover causing it to short and malfunction. They had reported to Ronnie that it was running and the ejectors just quit working. We cleaned it out and they started working again. It stopped a few more times and I blew everything out with an air hose under there and set-up a fan for the rest of the night.

Robot on #4-Put new Keenserts in the Robot wrist to accept end of arm tooling. Holes were stripped out.

Mp#20- Butterfly bolts broke on ejector platen and eject forward switch was damaged. Replaced screws and switch, checked operation. O.k. to run.

Call if there are any questions.

Sean