Saturday, September 18, 2010

Mike Daniels-B Shift

Good morning all,

 

Quiet night no major problems on molding floor. I put the new control in matsui drier, its still in shop I let it run for around an hr or so with no problems so I green tagged it.

 

Have a great day

Mike

 

Friday, September 17, 2010

9.16.10 D shift continued.

Also, thought you might like to know that Marty informed me that he and Darryl might be trading shifts per Wayne's decision.??

9.16.10 D shift

Mp#8 - Mixer was leaking material from cylinder not shutting off flow from hopper.
Lubricated the cylinder and had no other problems with it.
May have to replace the cylinder (one on the back side) if there are any other problems.

Repaired one of the small conveyors.

Stripped major components from that dryer and put the rest of it in the scrap metal hopper.

Put one of the slow speed grinders back into circulation.

Added a task to the task list for the DME boxes, per Mark.

Cleaned up in the shop, took out trash and cardboard, swept, and picked up behind the metal shear in the shop.

Call if there are any questions.

Sean

Thursday, September 16, 2010

Ronnie Upchurch

 MP-16   Dryer  D-9 Temp. probe alarm.  They were running it at 250 & the High limit was at 200. Reset- OK.

 

Loader #6 on mezzanine not loading. The loader flap was stuck & not making the switch.

 

MP- Lube cycle alarm. Reset the counter & installed a new tube of grease.

 

MP-The boss fitting on the top inj. pump line was leaking. I took the line & fitting off ; the o-ring was cut. Mark had to go to IR-G to get

       the right o-ring. He reinstalled it – looks good.

 

MP-9  The  C- axis on the robot wasn’t working. I found a cracked air fitting at the solenoid. Also the coil piston was gummed up.Cleaned &

          reinstalled – Working good.

9.15.10 D shift

Mp#10-Robot- Stopping infrequently over the belt after part delivery.
Restarts fine, then runs for a few hours until it does it again. Has not stopped in awhile, they want to keep running it.

Moved everything out of the trailer out back and staged it to the left of the dock per Josh. Should be easy to sort and move now.

Put all of the items tagged for "shop" or to "strip" in the shop. Also Ronnie and I put the grinder from the bunker back in the shop and put the little one that was in the shop to the bunker.

Removed all of the Yushin pickers from the machines and located them in the staging area as well.

Mp#6- replaced nozzle heater band and repaired wiring from blow back.

Cleaned up the oil from #17 again.

Cleared the lubrication alarm on MP#1 also.

Swept up in the shop.

Call if there are any questions!

Sean

Tuesday, September 14, 2010

Mike Daniels-B Shift

Good morning,

 

Fairly peaceful night, minor adjustment on nippers on the fixture on press 3.

Tried to calibrate gravity loader on the dryer that is behind press 8 it still not acting right

Removed another small nozzle leak from press 15 no damage only down couple minutes.

 

Have good day

Mike

Monday, September 13, 2010

9.13.10 D shift weekend

Worked on Pm's for machines.
Started putting the core 2 stuff on 23.
Helped with processing some this weekend, we were short 1 tech.
Worked on the nut press cleaning the phosphate build up out of the tracks.

We need to order some repair parts to get some of our DME boxes back up and going again. a few have collected in the shop as well as some cards.
It would be nice if the techs could tag them with a brief description of what has been wrong with each card?

The weekend went relatively well.

Call if there are any questions. Have a great day.

Sean