MP- 1 Installed a cover on the touch screen control.
MP- 10 The nut press wasn’t working. The nuts weren’t sliding down the left side track; cleaned it – working now.
MP- 24 Replaced a broken roller on the operator side gate.
I didn’t see the pump for 21 yet. If it comes in tomorrow we’ll have plenty of time to install it since molding is down for two days.
Later………………………………