Saturday, April 9, 2011
4.8.11 D-shift Sean
Wednesday, April 6, 2011
4.5.11 D-shift Sean
Tuesday, April 5, 2011
4.4.11 D-shift Sean
Monday, April 4, 2011
3-3-11 Mike Daniels
Battled with robot on mp10 most of the weekend it would stop in random positions I checked power supplies the 12volt supply seemed a little hot but was working.
Mp26 drilled and tapped platen and installed robot, plumbed the air in and ran cables. I believe Sean is going to finish the interfacing process.
Dr18 in shop. I finished putting process heaters in and installed new blower/motor there is a board lying in the rack not sure where it goes or if it’s bad as I didn’t remove it. And that’s where we are on that.
Worked some on PMs.
Mike Daniels
Technical Specialist