Mp#12- Replaced the mercury contactor on zone #3 with a solid state contactor 25 amp. Checked all heater bands. O.K. to run.
Mp#4- Core problems. After determining hydraulics were working, and set to correct pressures and flow rates, had electrical signal dropping out on both core sets. Found they had same card in rack in common and found what appeared to be a bad socket on the terminal connector. I gently bent the top pin enough to where it would make a tight contact. No further problems.
Worked with Roy Smith and Charles Pack on understanding the robot on press #22 better. I strongly emnphasized the need to improve their habits of saving mold set-ups in the robot memory. I showed them how they could change or save set-ups in regards to different conveyors (tall or short).
Worked on the trolley/platform for the new hydraulic power pack unit.
Cleaned up in the shop.
Note about shutdown.
Bill Potter informed the team leader and the process techs that there was no need to set dryer timers since he was coming in early on Monday morning for start up since 3rd shift was not going to start on Sunday.
I did not get any other information since that so I did NOT set the dryer timers at Rogers' request.
I will call and confirm with him sometime on Sunday.