Robot interface on MP6 is ready to tie in to the I/O when the machine is down. The wires are labeled and hanging in the cabinet. It includes a Permit Eject Forward relay, so Y4C wire runs from the output of the controller to one side of the relay contact and from the other side of the contact back to the terminal strip where the valve wire is.
Added a chute to the convey on MP11 to run parts thru to MP12.
The Wittmann still has a problem with the Y axis.
Industrial Rubber will be in tomorrow to survey all the hydraulic fittings we will need for our new crimper. I gave Gary Gore’s name as the contact for tomorrow.
Don’t forget I am off tomorrow.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
No comments:
Post a Comment