All vertical conveyors should be wired with star conveyor interface and with a manual run/auto toggle switch.
Screw tip for MP 5 came in today. It is a new 4 piece. I installed the tip and coupled the screw in back. Installed the endcap and nozzle tip and extension. We should check all bolts and nozzle for tightness when the barrel reaches the desired temperature. The nozzle is ready to be wired and we might think about turning the heats on one zone at a time.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7851
No comments:
Post a Comment