Mp#23- Looked at Valve Block changeover situation.
Found all the fittings need to connect to hose out of the new valve block .
We will need a fitting to tie into Pressure port on Machine and Drain/Tank.
We may have something that will work, need to remove hard lines to verify.
Same goes for the lines going to Core A/B block where QD fittings attach.
I looked at how the existing valve block attaches and tried to determine the best possible retrofit.
I took measurements and completed a print for a bracket that will allow us to make a bolt on replacement.
There are notes on my desk and I discussed it with Mark also.
Yushin Picker , pulled another one from the trailor and parts needed to complete the build. Problem I ran into is that None of the pendants I have tried are working. I am going to try a few other pendant cables or sensor boards as time permits.
Did the PM on press#3- repaired the blown out grease fitting Bill Potter mentioned. Will keep an eye on it. We are trying to get back on top of these leaks and minor repairs.Keep me informed on any new policy changes or developments, thanks.
Call if there are any questions!
Sean
No comments:
Post a Comment