Sunday, August 1, 2010

" C " Shift Weekend

MP- Robot kept stopping on “ Y “ axis. We found the over stroke block had moved.

 

MP-5  Robot CPU fault.  Mark pulled & replaced the cpu card & cleared the fault.

 

MP-20  Replaced the nozzle heater band & thermocouple.

 

MP-16  Ejector cylinder bolts broke; Found  1/8”  difference in the knock-out length.  Had tooling turn down knock-outs, replaced eject. bolts,

      & made a new eject. switch bracket.

 

Ordered more brass compression fittings from Nissei. ( for tie bar lube )

 

MP-5   Core 2 Leaking at manifold. Removed the fittings and put new Teflon on.

 

MP-6 thru 12  Vacuumed out oil pans.

 

MP-3  hooked up core switches & hydraulics on funnel mold.

 

MP-26  The chiller return line ball valve is cracked -  the valve that comes out of the 4” line up top.

 

MP-3   The barrel end cap is leaking. I kept an eye on it so they could finish the run. At the end of  C  shift, they needed about 100 more parts.

          They’re doing a mold change tonight. The end cap needs to come off to clean & reseat; That is if it’s not cracked.

 

 

 

       R, Upchurch

No comments:

Post a Comment