Good morning,
I helped Gary replace dump cylinder on pump#1 on mezz. It was sticking at start of shift. Went ahead and replaced the cylinders on pumps #2,3,4 and 5(per josh) found that the flange on pump 3 was cracked bad. I called Josh to see if we had a replacement,(we didn’t) so I tig welded it back together and Josh and I put it back together. Probably down 2hrs. Other than that fairly peaceful night in molding.
Have a great day.