Mp#5- Put the EOAT w/gate cutter back on and set values into the controller from the set-up sheet. Should be ready to start up.

Re-did some hydraulic core 2 fittings that were leaking and had been red tagged for repair. No further leaking.

Mp#3- Put the new EOAT w/gate cutter on and set it in as close as possible w/out running parts. I dry cycled it several times to check operation and get it timed close. May need to adjust the clamp position and ejectors, or the Y-axis up or down.

CAUTION!- The cutters are very SHARP. I bumped into them and punctured by hand!

Set the dryer temp correctly on the stainless cincinatti dryer on the mezzanine. It went down for wet material mid-shift, and after looking at it, it had been set to 32 F..?
Set it at 180 and it has been running fine.

Call if you have any questions. Be back Friday.

Josh-I submitted the rest of my PTO for the year, on your desk.

Thanks,

Sean