Friday, November 12, 2010

11.11.10 D-shift Sean

Mp#7- Robot PM. Had to use 2 of the spare air lines on the Y-axis arm, they were leaking. Inspected it thoroughly, cleaned and lubed. Ready to go.

Continued training on the robots with the techs on this shift.

I will continue touching up the presses with a little paint as they are down. I just need some roller pads and a roller handle if somebody happens to go to Lowes any this week or next.

Also, it should be noted that yesterday, before I left, Darryl had asked me to help him repair #24. Apparently they had tried to put two full width spacers on the clamp and it had worked loose and possibly damaged the threads? He got it started and reassembled, but thetre may still be some damage and further problems when the spacer needs to be changed out again. FYI.
The mold setter on D shift knows more about it.

Call if there are any questions.

Sean

No comments:

Post a Comment