Weekend !/14 – 1/16/11
MP-8 Replaced mixer loader hoses with the copper wire lined hoses to cut down on the static that affects the controller.
MP-5 The zone 2 barrel heats dropped out; the mercury contactor went out. Replaced it.
Also the “Y” axis encoder was acting up. It was loose at the shaft coupler.
MP-19 One of the bolts on the rear screw flange broke off, & the other two were loose. Removed the broken one & replaced all three with new bolts & “anti-seize”
MP-16 Large blow back; I cleaned it all off & disassembled the nozzle. I had tooling resurface the end cap & nozzle adapter. Had to do some body work on the covers
& align the sled.
MP-12 The right side palm button on the welder came loose. The mounting nut inside the box was broke, also the guard was missing. Replaced.
MP-7 Blow back- Mark caught it when it happened, but it was still packed & hard. ( Nylon ) Cleaned it out & replaced the nozzle band.
Assembled a work table for Potter.