Ronnie Upchurch

               Weekend    !/14 – 1/16/11

 

MP-8  Replaced  mixer loader hoses with the copper wire lined hoses to cut down on the static that affects the controller.

MP-5  The zone 2 barrel heats dropped out; the mercury contactor went out. Replaced it.

          Also the “Y” axis encoder was acting up. It was loose at the shaft coupler.

MP-19  One of the bolts on the rear screw flange broke off, & the other two were loose. Removed the broken one & replaced all three with new bolts & “anti-seize”

MP-16  Large blow back; I cleaned it all off & disassembled the nozzle. I had tooling resurface the end cap & nozzle adapter. Had to do some body work on the covers

      & align the sled.

MP-12  The right side palm button on the welder came loose. The mounting nut inside the box was broke, also the guard was missing. Replaced.

MP-7  Blow back-  Mark caught it when it happened, but it was still packed & hard. ( Nylon )  Cleaned it out & replaced the nozzle band.

Assembled a work table for Potter.