Wednesday, October 19, 2011

10.18.11 D-shift Sean

Continued with PM's.

Mp#4- They set the Top cover mold in and Ronnie had just put the core switch in. It was not adjusted yet and there were several other core wire related problems. I repaired wires and adjusted the switch until all was working correctly. O.K. to run.

Mp#22- Worked with the process tech Roy Smith to set up the edge valve body to run on the robot.
I fabricated a tool arm for mold #74008 and walked him through programing each step, then copying the "takeout only fascia" and renaming it 74008 valve body, then saving it again after the changes to the program were made. It is saved under the "takeout only" folder in slot #9.

Give me a call if there are any questions or you need to share anything with me.

I will return on Friday! Have a great day!

Sean

No comments:

Post a Comment