Sunday, January 15, 2012

1.13/14.12 D-shift Sean

Mp#20- Changed nozzle band, aligned sled after removing the shims that were messed up.
the clamp position switches got raked when the mold setter left some clamps near them and closed the mold up. I replaced 2 and fixed the others. Also cleaned and pm's the press.

Mp#24- wired up 2 heater bands on the nozzle at Roy's request.

Mp#1-Conveyor started messing up, it appears to be the gearbox or roller, I'll check it out more tomorrow. I swappped out conveyors for now.

Mp#9- robot relay contacts for conveyor was burned up. Replaced 24vdc relay.

Word on the floor was that one of the operators was throwing scales around.?? They asked me to find another scale for them, Roger and I located one in MRO. The broken one is back in the shop again.

Mp#3- blew a 2" flange hose. Ronnie got it replaced Saturday.

It is really cold this weekend!

Sean

No comments:

Post a Comment