#8- Changed the x-axis drive gear on the motor. Took the only one we had from MRO so we will be needing another.
PM'd robot on #5 press. It had about 15 broken screws that secure the rails on the z-axis. Cleaned and inspected everything else on it. Looks good now, wasn't sure about the encoder that got put on it yesterday, did anyone check it?
#6 robot- ran the pendant over to oper. side and made a hanging bracket for it. Still did not get the input tied in for clamp closed, we will look for a window to do that.
#21- Ronnie and I discussed that we need to take care of those leaks sometime. It will likely take awhile, I haven't done a clamp seal yet so we need to get with Jerome and set up a time to do that?
Call if there are any questions. Hank was in late last night looking for something?