Thursday, January 14, 2010

January 14, 2010

Worked some on the Eagle sole plate press controls, the main panel is wired and installed.  Gary mounted the cabinet and is working on some sensor mounts.  Ordered the solenoid valve block for this station.

 

MP20, process tech had problem with new DME cables not fitting or clamping up right.  They were six pin instead of five pin.  We have both on the floor, but we only stock the six pin.

 

MP13 shut down, ends up the front door switch was not made.  Use code 100 to find out.

 

Helped Elaine establish a healthy list of Robot EOA components and Josh ordered today from EMI.

 

Talked to EMI guys today about a quote for (3) Decline Conveyors for new machines.

 

Ordered two new hydraulic cylinders for one of the new molds.  Ortman brand.  Should be here in 4 days.  They are prepped for Go switches.

 

Ordered more Omron micro switches for new molds.

 

Ordered (2) station junction boxes from Motion.  Daman brand.  Hydraulic, 3/8” Ports, 3000psi working pressure.  Should be here 1/15/10.

 

Worked on MP14 sub station.  Replaced LH pneumatic PB on cord hook snap.

 

Loaded the truck headed for Zag with the Wittman Robot and Air Skates.

 

Mark

1/14/10

 

 

 

 

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506