Mp#16- replaced o-rings on the sled valve. Checked operation.
Mp#14- pulled the ejector stack off and replaced the o-rings. Checked operation. Looks like I will have to do it again, it is still seeping some.
Mp#2-Replaced the mercury contactor. It had failed. I put the date/press# on the box of the old one and placed it in recycling as required.
Mp#13- Question: So, if all of the process technicians say they have been having problems with the screw on 13, who actually filled out a work request or told someone in maintenance?
Ronnie and I pulled it out. I extracted the broken tip and scrubbed the barrel prior to measuring the bore. Could not locate a bore gage to do a measurement for 32mm (1.2598"). Someone in quality may have something on days, or tooling. (No tooling person on this shift.)
Tagged it out at disconnect, not locked.
Continued with PM's. Trying to gain a little each week on the leaks.
Waiting on seal kit for #14 and #25 sled, (on order).
Call if there are any questions, have a great weekend!
Sean