MP-24 Installed a relay to give a gripper signal when the arm is in the up position. MP-22 & 25 already have a relay.
I worked with Tony Cannon & Doug Mason setting up the Branson welder for the vacuum inlet assembly.
We got in eight different sizes of rubber plugs to use on hydraulic lines & valves. I put them under the hose crimp bench.
MP-10 is to stay down all weekend. The nut press fixture has to be changed to work with the engineering change made to the part. Mark & Gary will
finish it on Monday.
No comments:
Post a Comment