MP#17- They set that mold that needed to run with cores tonight, then pulled it out after I told them it could not run in there yet.
Do we need to wire in air eject or cores for this machine?
I was not certain as to what was decided as far as that goes, but I thought that Josh was going to have them install air cylinders on the tool.
Please let me know what we need to do so as not to attempt any rigging unauthorized!
What are we going to tie into? Air? Core 1? etc. Need a control switch installed? Is there outputs assigned? Software ready for it?
Roger put me on the spot with it and I wasn't really sure what to tell him so give me a call later or talk to Ronnie today so I can pick up where he leaves off today. Thanks.
Also got the cav 2 gate cutter disassembled, the intake test fixture disassembled, the air ten gate cutter stell table stripped down, and the welder table disassembled and palletized.
Saved the opto switches for the fan hsg assy project and plc from intake tester.
Sean
No comments:
Post a Comment