Mp#8- Finished tying in the robot e-stop with the machine per circuit changes outlined in the folder. Checked operation, O.K. to run.
Mp#10- Started making changes to circuit. I installed the relays and some wiring, but haven't cut into anything yet. Will continue tomorrow. We are running low of the 16-18 gage insulated terminal spade connectors. I have been using them with these circuit changes. May want to pick up some more, about 200 each. I have some red ones in the project box to go by.
Mp#12- The Eagle Fan Tester fixture was not sealing enough to pass the test. Replaced the O-rings and checked operation, O.K. to run. With the operators testing 8 parts per shift, I am not sure what the life expectancy is on them? We ma need to include a sign on the fixture to advise them to change o-rings if they suspect problems.
Mike and I looked at the leak on MP#3 at the end of my shift and we found the hose leaking under the manifold needs the o-ring replaced as well.
I also broke the porta-power cylinder fitting. Not sure where to get these, may want to check with A&H hydraulics? I will research that more tomorrow and submit something.
Have a nice day.
Sean