Saturday, July 16, 2011
Saturday July 16, 2011 D-shift
Cleaned out all of the robot control cabinets and replaced the raceway covers inside.
Continued working on PM's most of the night. Cleaned up oil under #8- it just looked like it had been there under the clamp a long time, not leaking anywhere. Painted the area around the valves, under the clamp.
Have a great day!
Sean
Sunday, June 19, 2011
6.18.11 weekend D-shift Sean
Had problems with the core 1 set limit flag being missing, not allowing sensor to pick up the set position. No way to fix it right without pulling out the mold. I made a tooling work order and posted it on the machine. Advised the technicians to use the timers or pull it out. They later had trouble with the part sticking in the front of the mold and thought it was the core not pulling completely. I was able to process it to where it stopped sticking for the most part. Gil looked at it and said they would get to it when itcame out.
Vacuumed up oil and cleaned up oil that was on the floor around the presses. Continued with PM's. Cleaned up in the shop also.
Installed several more of the lockout mechanisms for the pump motor E-stop switches. Only have about 3 or 4 left to do now.
We are shutting down at 6am Saturday morning due to the schedule change. Give me a call or send me a message if you need me in an extra day this week, otherwise see you Wednesday.
Sean
Tuesday, June 14, 2011
6.13.11 D-shift... Sean
Mp#4- replaced 24V4 fuse, Jason said that it got blown during a mold change, inspected it and found no smashed wires or anything.
Worked on PM's and changed out some of the E-stop switches to add the lockout feature for Walter.
They were running MP#3 so I could not continue with the current sensor installation.
Call if there are any questions. Have a nice day.
Sean
Monday, May 23, 2011
5.22.11 D-shift Sean
Worked on the nut press for the connector. The nuts that were loaded into it were oily and I had to tear it down and clean everything. It may still need some minor adjusting where the track runs into the press on the right side.
Continued with PM's.
I have been cleaning the water filter screens out, they are very dirty right now.
Have a great day.
Sean
Sunday, May 22, 2011
5.21.11 D-shift Sean
The guide-rod under the clamp cylinder came off, just needs to be put back on when it goes down again.
Bill said one of the loading system pumps gave them trouble today, gasket got sucked out causing lost suction on press 18.
Mp#1- Extruder started messing up and tripping the servo alarm. Took the panels off and discovered the lube had run dry although the grease tube holder appeared to have grease, it was not compressed by the spring. I replaced it and also had to clean out the screw threads and regrease them by hand. Got everything working again and then shot every fitting full of grease I could find. O.K. to run.
Note: The process techs or whoever cleans out the hoppers needs to stop blowing dust and material all over #1. It had plastic worked into the ball screw threads so bad it looked like teflon tape. It has not been that long since I cleaned it out last time.
Replaced the nozzle band on #21 at the techs request.
Mp#2- Zone 3 quit heating. Checked heater bands, thermocuople, found that the wire to the coil on the mercury contactor was loose. Tightened it up and checked operation, no further problems.
Have a nice day.
Sean
Monday, May 9, 2011
May 9, 2011
May 9, 2011
Worked with
MP1 clamp making noise removed guards at the end of machine, found broken screws in motor gear, gear had slid, belt hanging off, removed broken screws, pulled gear back in place, tighten bolts, greased all fittings on that end, replaced guards, looks OK
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Week of May 2nd, 2011
Replaced FHD board and pressure transducer on MP5.
Rebuilt sled cylinder on MP20.
Ran High Voltage lines on MP22 product arm. Provide means for easily
disconnecting EOAT on insert side.
Valves for Mezanine purge valves are on table.
Conair dryer push button touch pad is on table.
MP24 was faulted and would not clear the error. Ended up switching from
manual to auto and back and then reset cleared.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
1400 Salem Rd
Cookeville, TN 38506
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
test
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Wednesday, May 4, 2011
5.03.11 D-shift
I changed the sled pressure sensor and adjusted it. Still continued to bleed back. Changed the nozzle tip out and checked alignment, had problems where the shims had come out.
I made some new ones with the material we had in the molding projects cabinet. Put them on, adjusted sled alignment again, checked operation, appears to be doing fine now.
Mp#4- Repaired wires on Core 2. Replaced the entire cable which was too short anyway on the Steemer Nozzle Mold.
Continued with PM's.
Call if there any questions.
Sunday, April 24, 2011
4.23.11 Weekend D-shift Sean
Mp#20- Changed out a nozzle heater band and repaired a T/C connection.
Worked on the R2 Fascia Project some more. It is now on the table in the shop.
Cleaned up the shop and put some new tape on the floor in places. Took out the trash, etc.
Have a great Easter Weekend! Call if there are questions.
Sean
Tuesday, April 19, 2011
4-19-11(Mike Daniels)
Changed contactor on mp21 front zone.
Mp6 adjusted clippers on eoat they where gouging part.
Mp1 stopped a few times with a inj. Axis overload (overheat) alarm. Found bad fan in control cabinet replaced it haven’t had anymore problems from it.
Assisted techs.
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.
4-18-11
Mp16 removed nozzle tip and adapter because it was leaking between the two. Cleaned and milled surfaces and reinstalled.
Worked on PMs
Swept shop
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.
Monday, April 18, 2011
Ronnie Upchurch
MP-3 Replaced one rear zone heater band & nozzle tip band.
MRO- Sorted out parts on west end shelves- ( non stock items ). Made some of them stock items, Moved some to trailer, & threw the rest out.
MP-7 The nozzle contactor may be about to go out. Tech called me to the press & said the nozzle wouldn’t heat. When I opened the cabinet to check it out,
The heats started working. I f it quits again, I’ll change it out.
MP-18 The hot stamp heat was cutting off. I checked the T.C. connection & checked for any other loose connections. Put it back together & turned it on,
OK for now.
MP-5 The hot stamp foil jog motor is indexing slow. It’s keeping up. Didn’t get a chance to check it out. Maybe it will hold out till they finish the run &
give us time to work on it.
Friday, April 15, 2011
Program change on MP3
Since the mold was broken by eject retract with a part still on it. Temporarily we have changed the PLC program on press 3 with added safe guards to prevent mold from retracting the ejectors if the you do not have vacuum confirmation and there is a back check on the vacuum sensor to make sure the switch is adjusted properly. Multi-eject, Y up after eject, and eject retract before X back has been disabled. We will work on a better solution as time allows.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
FW: Good Friday
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
From: Jerome Flowers
Sent: Friday, April 15, 2011 4:17 PM
To: Mark McKee
Subject: Re: Good Friday
Hey Mark
I forgot to tell you. We are working Friday and taking off Sunday for our
Jerome Flowers
Molding Manager
From: Mark McKee
To: Jerome Flowers
Cc: Ken Paschall
Sent: Thu Apr 14 05:09:55 2011
Subject: Good Friday
What is the molding schedule for the Good Friday weekend. I need to communicate this to the guys.
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Thursday, April 14, 2011
Ronnie Upchurch
MP-16 Wouldn’t shoot. One of the nozzle heater bands was bad, but it didn’t help that they heated the nozzle with a torch ( Sanaprene ). Needless to say,
It was like concrete. I took the nozzle & adapter apart & cleaned. Reinstalled with new heater bands & a tip with a larger oraface.
MP-3 Breland said he wanted clippers set up for the canister. We looked at it & talked to Jerome. He said it would be easier to break the runner off & use
a heat gun on the stress mark.
FW: New Star XQ-600V
To change the cycle start timer in the new Star XQ-600V press “maint” and “down arrow” till you see RY3 OFF Timer.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
From: Hiro Natsume [mailto:hirostartn@bellsouth.net]
Sent: Thursday, April 14, 2011 6:44 AM
To: Mark McKee
Subject: RE: New Star XQ-600V
Press 'maint' and down alrrow till you see RY3 OFF timer.
Good luck!
Hiro Natsume
Star Automation, Inc.
615-545-7661
From: Mark McKee <MMcKee@ORECK.com>
Sent: Thursday, April 14, 2011 5:49 AM
To: Hiro Natsume <hirostartn@bellsouth.net>
Subject: New Star XQ-600V
Good morning,
Where is the cycle start timer you changed in the robot to make it run?
Thanks,
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
4.13.11 D-shift Sean
Worked on minor support stuff off and on all night for techs, material handler, and moldsetter.
Assisted process techs some, we had one go home early tonight.
Have a great day. I will be back early today around 4pm.
Sean
Tuesday, April 12, 2011
4-11-11 Mike Daniels
Mp3 had some problems with nozzle heats running to 485 and the set point was 450. The contactor was good. Done some tweeking with the offset and gain. Still no good. I eliminated 2 bands as someone had crammed too many bands on a long nozzle extension and a long nozzle tip causing degradation of material causing splay That’s why I was called there for in first place. Heats are consistent now.
Worked on PMs
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.