Tightened up the pump drain plug on the vib. welder; It had a slow leak. I’ll check it again after they run it awhile.
MP-21 Vacuumed oil under sled & on rear deck.
Installed eject. back switch on new mold # 74017.
Installed conveyor tray behind MP-25. They can try it out---- see if they need to modify it.
Loader # 7 on mezzanine wasn’t pulling from Gaylord. I found two other loaders leaking at the vacuum ports. I changed out the seals
R.Upchurch
“ C “ Shift Maint..
No comments:
Post a Comment