Sunday, January 17, 2010

" C " Shift

    Tightened up the pump drain plug on the vib. welder; It had a slow leak. I’ll check it again after they run it awhile.

 

 MP-21   Vacuumed oil under sled & on rear deck.

 

Installed eject. back switch on new mold # 74017.

 

Installed conveyor tray behind MP-25.  They can try it out---- see if they need to modify it.

 

Loader # 7 on mezzanine wasn’t pulling from Gaylord. I found  two other loaders leaking at the vacuum ports. I changed out the seals

 

 

 

          R.Upchurch

          “ C “ Shift  Maint..

No comments:

Post a Comment