Friday, May 28, 2010

This week 5/24/10

Ordered new Saskawa servo amp from Nissei for MP1.  Should be here 6/1/10.  Called Saskawa and requested they send us our unrepaired unit and regenerative pack.

Should be here 6/1/10.  Nissei is now set up to accept P.O.’s, net 30.

 

Set up welder ejectors on MP12 for new Edge fan housing ejector cylinders, used outputs 12 and 13, top two single valves.  Firing sequence is top ejectors step 5, bottom ejectors step 6.  When door open part is laying loose for operator to remove.

 

Changed out safety latches in hoist ring hooks in molding production area.  (both hoists)

 

Installed additional 480 outlet on MP18.  Two outlets share a 30A breaker for Thermalators.

 

Fabbed and installed extrusion frame to hang heater wire junction box on MP2.  Mount junction box to new frame.  Replace and label all heater wiring.

 

Install and adjust spare Robot EOAT for fan housing on MP8

 

Replaced  (4)  2” load system hose sections up in mezzanine area with what hose we had on hand.  More hose is coming.  Replaced 2.5” material hose on top of surge bins.  Installed elbows and partially hard piped some drops.  We are trying to eliminate all vacuum leaks.

 

Install sand paper to the bottom of rework fixture for orbiter disks and realign.

 

Worked on color pump signal for MP1.  Parts are here to steal a signal from the output of the servo drive to the motor.

 

 

 

 

 

 

 

 

 

Mark McKee

Technical Specialist

Oreck Manufacturing Company

1400 Salem Rd

CookevilleTN  38506

mmckee@oreck.com

PH      931.646.7856

CELL  931.644.5289

FAX    931.646.7851

 

No comments:

Post a Comment