Wednesday, June 2, 2010

6.1.10 D-shift

Mp#5- stopped for "Prefill did not open in time" alarm.
I was able to open the clamp by changing the offset for clamp tonnage on menu 93 from 1799 to 2250,and menu 92/convec 921, from 2000 to 2350 to get the clamp tonnage to zero, but it will not run yet. It now will alarm again but will open if you clear the alarm.
I spoke with Clarence at Milacron service who thought it sounded like the prefill valve was bad. I looked in MRO for another directional valve like it but couldn't locate one. They are using press #3 or I would have tried some parts from it maybe. I wasn't so convinced it was the valve bad yet, and I want to talk with Josh about it first.

Mp#11- Potter asked me to check the cores when I came in, I checked that the machine was working fine, used our test rig to verify switches and hoses. They had the collar tool out working on it and when it was set back in they never worked, it appears to be jammed up internally.

Worked on DME boxes, replaced cooling fan, and installed #3 jumper in all of them so they will work with the new style cards.

Changed the cord plug on liquid colr pump for 13 also.

May want to look over the gate cutting fixture that is for the cannisters. it is in the tool room because it needs another braket made. It looks like it is time for an overhaul of that fixture, I am welcome to any ideas with it.

Be back in at 6pm.

Sean