6.10.10 D-shift

D shift had 2 process techs out wed/thurs so today I did spend some time assisting with set-ups etc.

MP#9- built and end of arm tool for mold # 78165 and roughed in the parameters.

Made a tool for them to insert the magnet in the fans they were welding at #12.

As it stands, I told Darryl that I will not be working Saturday and Sunday, but if he needed me to come in and fix anything that was down, all he had to do was give me a call. My number is posted in the molding office.