Mp#4- Built EOAT for Edge Baseplate. Got it running, had to adjust Core pressures and flow controls. Was operating below 5oopsi. Now around 1600psi.

Mp#15- did PM on sprue picker. Repaired stripped out screw on advance stroke adjustment plate. Greased and inspected.

Repaired broken lube line on non-op side platen skate. replaced the nylon tubing with a piece of aluminum tubing. Hopefully it will last longer this time.

Chaged out EOAT on #11 for the Edge Top-cover core.

Set-up robot on press #23 for top cover single cavity tool.

Mostly helped process techs tonight, as we had one leave early in the shift for personal issues so we were short handed.

Will continue P.M. program tonight. Need to look into a way of tracking which ones are getting done so that we do not miss any.

Call if there are any questions.