Mp#2 Grinder- It was overfilled with material and clogged up almost to the point of meltdown. We unclogged it and cleaned it out reset the breaker and tightened up the E-stop switch. Put back in use.
This occurred at 6:05 pm and had to have been clogged for at least a half an hour earlier on C shift, before our shift began.
This would make a good action item for September!
Vibratory Welder- Did a full P.M. on it. Tightened up door limit switches, brackets, and checked out hydraulic unit. greased the linear rails and inspected for anything loose. Relabelled tubing and Mark and I reset the adjustments on the laser range sensors.
Repaired leaking core fittings on the single cavity top cover tool in #11.
Continued with PM program, lubed tie bars and refilled reservoirs, checked for damged lines etc.
Have a good weekend.
Sean