Saturday, March 12, 2011
3.11.11 Sean Kearns
Continued with PM's
Sean
Wednesday, March 9, 2011
3.8.11 Sean Kearns D- shift
We had a power failure at 11:02 pm last night. It tripped the #3 panel which fed the North Bus. I was able to reset it and the air compressor and we were going agin shortly after 12:00.
Mp#9- The Z-at part drop maximum limit needs changed in the HMI's. It would not hurt to set them all that way, or make the value accessible from the touch screen. Maybe add it to the speed control page.
Continued with PM.'s!
Call if there are any questions.
Sean
Tuesday, March 8, 2011
3.7.11 Sean D-shift
Mp#18- Had trouble with zone #1. Could not get the controller to output a signal. Found a relay with a bad set of contacts, moved wires over to a spare set on the same relay. Never could get the controller to send a signal. Changed it out 4 times and finally got one of the very older analog types to work correctly. I only had used stuff to try out, so we may need to order a new one to put on the shelf...when the money returns?
Mp#15- Did not get very far with it. I pulled the M1 valve of and cleaned it, it was very clean and solenoids ohmed out good. Reset mold thickness, etc. and bled out the air, problem remains.
Will proceed some more tonight.
Sean
Monday, March 7, 2011
Ronnie Upchurch
MP-21 Worked with Josh & Mark trying to figure out why it’s generating so much air in the oil. Mark is checking into having the pump rebuilt. It’s down
until we get a response on the pump.
MP-15 I replaced the C-7 check valve, still no go. The Toshiba tech. said we’re in the right area; sounds like something isn’t shifting fast enough. I did all
the system pressure tests they told me to try, & it checks out OK, so at least we know it isn’t one of the pumps. The next step is to start pulling the
clamp valve stack apart & check for sticking spools etc.
B shift 3-4-11 thru 3-6-11
Worked on PHs
Cleaned a pithead from nozzle on mp16 and rewired.
Vacuumed excess oil from presses
Mp12 broke ejector cylinder bolts. Repaired
Replaced a broke belt on grinder behind mp10. Nobody knows how or when this happened.
Have a Great Week
GONE FISHIN
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.
Friday, March 4, 2011
3.3.11 - Sean
MP#16-Replaced the sled forward switch.
Have a great weekend. Call if there are any questions!
Sean
Thursday, March 3, 2011
Ronnie Upchurch
Dryer in the shop – over temp. alarm. I had to adjust the bed switch.
DR-4 In the mezzanine – Alarm 11. The top of the drive motor housing was loose & the gear was slipping. Tightened .
Chuck w/ Nissei is faxing us some better copies of the valve driver set up.
MP- 15 I ordered a new clamp check valve – ( C-7 on the hydraulic print )
I made a purchase req. for some more Citra-Solv degreaser & Litho- Lube grease.
I got a quote for new Spenser Vortex blower- 906.00.
We got everything cleaned up & picked up in the shop, but didn’t see anyone walk through today.
Wednesday, March 2, 2011
March 2, 2011
March 2, 2011
Ordered a hardened screw, barrel, and tip for MP13. Right now it is a 4WK lead time.
Labeled steemer tank EOAT.
Worked with Ronnie on MP11
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
2-28-11 3-1-11
2-28-11
Worked on dryer issues all night. Dryer11 replaced overload contacts on blower motor then it lost a process heater contactor do we see a pattern these things are ending there life and are in need of replacement. Dryer was brought to shop looped out and running so far so good.
Mp2 had issues with Mold and cores not set up to run on cores read Josh’s blog about it.
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.
Tuesday, March 1, 2011
March 1, 2011
March 1, 2011
Work with F1 Fan Housings and new tester. Fan Housings that had a .7 weld time proved to be leakers and could be destroyed at about 5psi. Housings with .9 weld time had a small leak but passed the tester and were able to be destroyed at 10psi. Housings with 1.0 – 1.1 seemed to be sealed / welded very well with destruction around 12-14 psi. All new housing halves passed the drop tester at 30inches.
Wired mold #52926 (Steemer Tank) for cores. Swapped hydraulic fittings on the mold and connected to core 1 on MP2. Adjusted switches and cores worked on A1 and B1.
Talked to Josh about MP21, he showed me the valve to increase speed of functions, worked with Rick to get fan runners to drop. Repaired pull cable for plates on mold.
Set up ban saw in molding shop for techs.
Helped
Worked on MP11 Robot, Robot would grab parts and stop above mold, say in unsafe position. Ended up being no time in cycle start timer on mold machine.
Ronnie and I will try to calibrate MP11 and MP21 tomorrow.
Mark McKee
Technical Specialist
Oreck Manufacturing Company
mmckee@oreck.com
PH 931.646.7856
CELL 931.644.5289
FAX 931.646.7615
Recovery Tank MP02
Hello All,
In the past we have used the Ejectors to control the stripper plate on this mold because when not using the robot multiple strokes were needed to clear the part. It is a lot safer to use the Core circuit because when using the Ejectors the set-up parameters were just “tricking” the machine and everything was based on time with no part removal verification. When using the Core circuit in combination with the robot, part removal is verified.
Just remember that on the “Special Options” menu of the robot that “Cores Logic” needs to be turned ON.
Any questions regarding this can be directed to me or any member of the Molding Maintenance Department.
Thanks
Joshua Ledbetter
Molding Maintenance Manager &
Manufacturing Engineer
Oreck Manufacturing Company
(C) 931-239-3235
(F) 931-646-7615
Monday, February 28, 2011
2.26.11 (Weekend of) Sean
Mp#3- replaced 1-1/4" hose on the op side clamp assist cylinder that was leaking bad. Cleaned up the oil.
Mp#1- installed air pressure regulator on the EOAT so it would not damage fans. They had turned down the regulator on the robot to where the system pressure switch would no longer make, faulting out the robot.
Mp#21-Sole Plate wheel press, replaced one of the two hand air switches.
Mp#2- Replaced the wire on the ejector back switch of steemer tank mold. It got smashed.
Mp#24- Wheel/Tire Press Tool. Made a hand tool so they could rework the cold tires that were molded. This item needs to be revisited by one of our manufacturing engineers involved with it. The normal automatic operation is damaging the parts when used.
Mp#10- The nut press is still having problems when the nuts are not cleaned, the track will not load up correctly. Wev put some in a 5 gallon bucket with degreaser and tumbled it for an hour. Then cleaned them off with rags and air. No one can give me an answer as to what is the procedure with this situation. Who makes the decision? Communication has been poor lately on some of these problems that keep lingering around.? Thanks for any support you can get.
Continued with PM's and other support functions.
Have a very nice day.
Sean
Sunday, February 27, 2011
Ronnie Upchurch
2/25/11
Worked on the “Randy Russell” hot stamp project.
Ordered a large assortment set of metric o-rings from IR-G.
MP-13 Started getting material together to replace the section between the hopper & feed throat that keeps clogging up.
MP-6&7 Vacuumed out oil pans & emptied the oil vac.
2/26/11
MP-13 Made a new adapter plate for the hopper & remounted.
MP-24 Fabricated a temporary knock-off tool on the eoat for the wheel mold.
MP-16 Replaced the timer relay in thermolater – T-4.
2/27/11
MP-2 Core 2 pull not making. The switch wasn’t working, but when I removed it from the cylinder, it checked OK. I changed it out. Working OK.
MP-6 I got the numbers off the pump to order a pump seal.
MP-15 Need to order a PS1 pressure switch. It build tonnage -2000psi- but bleeds off to about 1650psi.
MP-5 The nozzle heat wasn’t consistent. The contactor coil was weak. Replaced.
MP-2 The male quick connect on core 1 was leaking. Removed, put on Teflon tape, & reinstalled.
Ronnie Upchurch
MP_7 Alarm 5111 – The clamp close control switch got twisted around & the neutral position was actually the close position.
DR-32 Alarm 11 - Index time too long. The index limit switch was bad.
MP-6 The conveyor wasn’t indexing. The relay in the robot cabinet burned out. Replaced
MP-21 The zone 2 heat dropped out. The contactor coil was weak. Replaced
Mark & I worked on the “Randy Russell” hot stamp project. He’s satisfied, ( For Now )
Wednesday, February 23, 2011
2.22.11 - Sean
Also wired up the cores and checked the sequence and operation for them. The mold setters are always asking about which sequence is what on the Nissei's so I provided them a cheat sheet and tied it to their cart.
Also, need some O-rings to continue beating down these leaks. I would just get a few kits of metric and a few kits of square cut. Or whatever? Thanks.
Also, out of the Orange degreaser from Prochem. It is a very good product, cuts grease and liquid color very well. Need to re-order or try to get it as a stock item, possibly? Thanks.
Cleaned up in the shop. I will try to 5-S more this weekend.
Continued with PM's.
Have a great day!
Sean
Tuesday, February 22, 2011
2.21.11- Sean
Mp#8- Worked on Machine and Robot PM. Painted some parts of the press.
Made a fixture for Bill Potter to rework the C-handle overmolds. Drill press was tore up when I went to set it up. Had to replace the switch on it. Everything good to go now.
Have a great day!
Sean
Sunday, February 20, 2011
2-19-11 Mike Daniels
Mp21 replaced nozzle band and thermocouple also had a bracket from the y axis fall off. Replaced with new hardware
Mp11 cleaned and put end cap back on. Rewired nozzle bands and installed the guards good to go and was running shortly after.
Worked on PMs
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.
Friday, February 18, 2011
2.16/17.11 Sean
Mp#14- pulled the ejector stack off and replaced the o-rings. Checked operation. Looks like I will have to do it again, it is still seeping some.
Mp#2-Replaced the mercury contactor. It had failed. I put the date/press# on the box of the old one and placed it in recycling as required.
Mp#13- Question: So, if all of the process technicians say they have been having problems with the screw on 13, who actually filled out a work request or told someone in maintenance?
Ronnie and I pulled it out. I extracted the broken tip and scrubbed the barrel prior to measuring the bore. Could not locate a bore gage to do a measurement for 32mm (1.2598"). Someone in quality may have something on days, or tooling. (No tooling person on this shift.)
Tagged it out at disconnect, not locked.
Continued with PM's. Trying to gain a little each week on the leaks.
Waiting on seal kit for #14 and #25 sled, (on order).
Call if there are any questions, have a great weekend!
Sean
Wednesday, February 16, 2011
Ronnie Upchurch
MP-10 Robot part grip not working. It was getting a signal, but no air was going through the valve. I took the solenoid valve apart & cleaned it out. OK now.
MP-23 No nozzle heat—Jason changed the tip heater out; it must have grounded out. I reset the breaker. Working OK.
DR-27 The loader had no vacuum. I found the flapper valve had broken off. I made a new one & installed it.
DR- 10 ( The 100# dryer in the shop ) I checked the power supply control voltage, cleaned the edge connectors on the I.O. & mother boards, found the regin. temp
probe plugged into the wrong spot, & installed a new control door cover. Test ran it in the shop for 3 or 4 hours. Ran good.
The hose reducer for the new Novatec dryer came in. I installed it. They can have it back now.
I made up a purchase req. for another Novatec loader.
2-15-11
Good morning All,
Nothing major to report. Worked on PMs.
Mike Daniels
Technical Specialist
Oreck Manufacturing
Cell 931.287.6252
Eat. Sleep. Fish.